Laserfiche WebLink
C C 1 [ 1 [ { [ f [ l <br /> L <br /> aff must reviewjob-specific workplan and coordinate with project manager to verify that all upfront logistics are completedprior to starting work including,but not limited to,permitting,access <br /> ents, and notification to required contacts(e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety meeting must beperformed and documented at the beginning ofeach <br /> Plan,Prevent,Execute PPE procedures must be used throw hout the pLoiect. Weather conditions Lheat,cold,rain,1ightnin_g2 must also be considered. <br /> Job Steps 0 Personal Protective Equipment 0 Potential Hazard 0 Critical Actions <br /> vest,Exclusion zone equipment,and Improper labeling or storage, •Determine the best location to set the sample containers(avoid stepping on them, <br /> chemical resistant gloves as necessary injury from broken sample bottle <br /> and leather work gloves.Wear (cuts or acid bum). or other materials coming into contact with them.) <br /> appropriate air purifying respirator •Label samples in accordance with sampling plan <br /> with combination organic vapor/P-100 <br /> cartridges as needed. •Fill sample containers slowly and over a bucket to eliminate potential spills.Or <br /> place sample container on bucket lid on the ground or other surface,then fill <br /> container. To avoid sample container from slipping out of your nitrile gloved hand. <br /> •Do not over pack the cooler. <br /> •Use bubble wrap or other insulating material for cushioning sample containers in <br /> the cooler. <br /> •Perform air monitoring as outlined in Section 12. <br /> •Have appropriate respirator with combination organic vapor/P-100 cartridges <br /> within 3-5 feet of working location for quick access. <br /> • Keep samples stored in proper containers,at correct temperature,and away from <br /> work area. Handle bottles carefully..___..___..._.._...._.._--............._. <br /> Proper clean up and disposal of Safety glasses Exposure to broken glass and acid •Isolate area where broken glass is located <br /> broken sample container. Leather Work Gloves (from water preservation acids) <br /> Hand Broom and Dust Pan Injury •Determine if the sample container was preserved(did it have acid in it?) <br /> A receptacle for the broken glass <br /> (something to contain the broken glass •Determine what to contain the broken glass in,and where to dispose of the broken <br /> (double garbage bag,a box,or bucket. glass before beginning to pick up the glass. <br /> Use CARE! •Collect equipment needed to clean up and contain the broken glass. <br /> •Minimize"picking up"broken glass pieces with your gloved hands. Use a dust <br /> pan if possible/practical. <br /> •If broken glass is located inside a container(i.e.box),to the extent practical,leave <br /> glass inside box and put entire box into a garbage bag. Double bag if warranted. <br /> Place into dumpster. Q <br /> •If broken glass is inside a cooler,remove all other sample containers and place in al <br /> safe location,then use hand broom and dust pan to sweep up glass in cooler. <br /> • After clean up is complete,contact your Project Manager to report this Near <br /> Loss/Miss. <br /> ... ...... . <br /> Dispose or store purge water(if Steel toed and shank shoes,hardhat, Back strain. Exposure to <br /> any)onsite. safety glasses with side shields, contaminants. If disposing •Use proper equipment to transport water(pumps,drum dollies,etc.). <br /> hearing protection,reflective safety through onsite treatment system, •Perform air monitoring as outlined in Section 12. <br /> vest,and chemical resistant gloves as damage or injury from improper <br /> necessary.Wear appropriate air use of equipment. Improper •Have appropriate respirator with combination organic vapor/P-100 cartridges <br /> purifying respirator with combination storage or disposal. within 3-5 feet of working location for quick access. <br /> organic vapor/P-100 cartridges as •Label storage containers properly,and locate in isolated area away from traffic and <br /> PG&E SECOR International Incorporated <br /> SECOR Project No.05OT.50234.00.0003 PG&E French Camp <br /> HASPB.doc <br /> 24 <br />