Laserfiche WebLink
Field staff must review job-specific workplan and coordinate with project manager to verify that all up front logistics are completed prior to starting work including,but not limited to,permitting,access <br /> agreements, and notification to required contacts(e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety meeting must be performed and documented at the beginning of each <br /> workday. Plan,Prevent,Execute PPE rocedures must be used throu hout the proiect. Weather conditions heat,cold,rain,lightning )must also be considered. <br /> „ Steps 19 Personal ProtectivePotential Hazard 0 Critical Actions <br /> needed. other site functions. <br /> •Coordinate offsite disposal(where applicable). <br /> _ •Do not attempt to lift,push or move drums without the proper tools or equipment. <br /> Supervisor/HSC must confirm all Possible injuries and damage to •Visually inspect each and every borehole. <br /> boreholes are closed,filled in property due to stepping into or, <br /> and/or capped. ` _..___.....__... - driving over the well .............. ... -... _... ... ......... <br /> _. __..-._... _—__._._._. - --- _. .... ..._...._ .... ............. .....__....._... .................._. <br /> Clean site/demobilize. Steel toed and shank shoes,hardhat, Traffic. Safety hazard left on site. <br /> safety glasses with side shields, Lifting hazards.Sharp equipment, Use buddy system as necessary to remove traffic guidance and control equipment <br /> hearing protection,reflective safety broken glass,heavy equipment. Leave site clean of refuse and debris. <br /> vest,and leather gloves for the non-. <br /> chemical aspects of work as necessary. • Clearly markibarricade any borings that need later topping off or curing. --� <br /> Notify site personnel of departure,final well locations and any cuttings/purge water(' — <br /> left onsite. <br /> •Use proper lifting techniques <br /> •'Use a mechanical aid or other colleague,as appropriate to help lift weights over <br /> 501bs.. <br /> Ensure that all waste containers are closed before moving them. <br /> •Do not dump off the back of the_pick-up_ <br /> ----� _-. �:.__ — -- —-- -- -..._ ,...,.. _... ..........--............_............_ ... .._....... __....- -: _......................_.._ ._....... <br /> Package and deliver samples to Bottle breakage,back strain. <br /> lab. •Handle and pack bottle carefully(bubble wrap bags are helpful). Use proper lifting <br /> . <br /> .......... ........................................................ ........_._ - technic uesi_...._... ----- .._.. <br /> PG&E SECOR International Incorporated <br /> SECOR Project No.050T.50234.00.0003 PG&E French Camp <br /> HASPB.doc <br /> 25 <br />