Laserfiche WebLink
• i <br /> CONTENTS <br /> 1.0 GENERAL INFORMATION..............................................................................................1 <br /> 1.1 Background Information..........................................................................................1 <br /> 1.2 Proposed Monitoring Well Locations..................................................................... 2 <br /> 2.0 DRILLING DETAILS.........................................................................................................2 <br /> 2.1 Drilling Equipment................................................................................................. 2 <br /> 2.2 Well Installation Activities.....................................................................................2 <br /> 3.0 MONITORING WELL DESIGN........................................................................................3 <br /> 3.1 Well Casing and Screen.......................................................................................... 3 <br /> 3.2 Filter Pack, Bentonite Seal, and Grout.................................................................... 3 <br /> 3.3 Well Protection....................................................................................................... 4 <br /> 4.0 WELL DEVELOPMENT....................................................................................................5 <br /> 5.0 WELL SURVEY .................................................................................................................7 <br /> 6.0 SCHEDULE FOR COMPLETION OF WORK..................................................................7 <br /> LIST OF FIGURES <br /> Figure 1 Groundwater Monitoring Well Locations................................................................... 8 <br /> Figure 2 Topographic/Well Detail Map.................................................................................... 9 <br /> LIST OF TABLES <br /> Table A-1 Summary of Information for Laboratory Analysis of Groundwater Samples <br /> Collected at French Camp Land Application Area.............................................A-6 <br /> APPENDICES <br /> Appendix A Groundwater Sampling and Analysis Plan A-1 <br /> Appendix B Health and Safety Plan B-1 <br /> French Camp-Monitoring Well Installation Workplan i SAB027100 <br /> September 2006 C:Tmuments and Settings\mlagorio\Local Settings\Temporary Internet Files\0LK9F\Work Plan <br />