My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1405
>
2900 - Site Mitigation Program
>
PR0505137
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 2:17:12 PM
Creation date
1/15/2020 1:17:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0505137
PE
2960
FACILITY_ID
FA0006565
FACILITY_NAME
STOCKTON SOIL TREATMENT FAC
STREET_NUMBER
1405
Direction
S
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
1405 S FRESNO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ogden Environmental Services, Inc. July 29, 1988 <br /> Mr. William S. Rickman Page 2 <br /> 3. Containerize soil cuttings from the inner perimeter wells onsite. <br /> (These cuttings will subsequently be thermally treated with the <br /> Circulating Bed Combustor (CBC) . The outer perimeter wells are <br /> beyond the zone of contamination as defined in the assessment <br /> report dated May 20, 1988. In the unlikely event that contami- <br /> nation is observed in these borings, soil cuttings will be contain- <br /> erized for subsequent treatment.) <br /> 4. Containerize development water from the inner perimeter wells and <br /> the piezometers onsite prior to treatment with the water treatment <br /> system. <br /> S. Abandon all wells in an appropriate manner. (The inner perimeter <br /> dewatering wells, as well as the existing groundwater monitoring <br /> wells KF-MW-1, 2, 3, and MEI-MW-1, 2, 3 will be abandoned by <br /> complete removal of well materials and gravel pack during the <br /> proposed excavation. The outer perimeter dewatering wells and <br /> piezometers extending below the base of the proposed excavation <br /> will be abandoned after completion of remediation activities by <br /> grouting from top to bottom in accordance with the San Joaquin <br /> Local Health District regulations.) <br /> Prior to initiation of this work, the Central Valley Regional Water <br /> Quality Control Board and the San Joaquin Local Health District must give <br /> approval of this plan. Please call if you have any questions or comments. <br /> Very truly yours, <br /> McCLELLAND ENGINEERS, INC. <br /> o"t' ' <br /> Thomas D. Matteucci <br /> Project Hydrogeologist <br /> Thomas W. McNeilan, P.E. <br /> Engineering Manager <br /> TDM/TWM:val <br /> cc: David Carls (San Joaquin Local Health District) <br /> Gordon Lee Boggs (CVRWQCB) <br /> 81603C/H-2 McClelland <br />
The URL can be used to link to this page
Your browser does not support the video tag.