My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1817
>
2900 - Site Mitigation Program
>
PR0540859
>
FIELD DOCUMENTS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 2:47:49 PM
Creation date
1/15/2020 2:29:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
FILE 1
RECORD_ID
PR0540859
PE
2960
FACILITY_ID
FA0023361
FACILITY_NAME
PLAY N PARK (FORMER BARNES TRUCKING)
STREET_NUMBER
1817
Direction
S
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
1817 S FRESNO AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Extraction Well Design <br /> Proposed Dewatering Project, Clearwater Group <br /> 1817 South Fresno Avenue, Stockton, California <br /> Pour dewatering wells will be installed, which will: <br /> • Be spaced approximately 40 feet apart, <br /> • Be drilled using a 2 foot (244nch) auger, � s L <br /> • Be advanced to the depth of the plume, from 20 to 30 feet below ground surface (bgs) . <br /> • Have an 8-inch Schedule 40 PVC well casing, with 0.010 machine-slotted screen placed across <br /> the lower 15-foot groundwater producing zone, with the intention of producing a radius of <br /> influence of between 25 and 40 feet, <br /> • Have a sandpack of #2/12 sand separating the screened interval from native materials and <br /> extending from the bottom of the boring to two feet above the screen, to prevent dredging of fine <br /> materials by the well, <br /> • Have a minimum 5 feet (or longer) of tremmie-grouted bentonite slurry above the sandpack, with <br /> 30% solids and a non jelling agent such as Wildbens Enviroplug (if required bentonite pellets <br /> may be placed before the bentonite is tremmied, not to exceed 6 inched in thickness), <br /> • Have a cap composed of a minimum of 5 feet of neat cement, <br /> • Be dewatered by 2.5 horsepower 2-inch by 2-inch submersible pumps, capable of pumping <br /> approximately 40 gallons at 40 inches of head, and <br /> • Be plumbed directly to the holding tank in series and pumped individually using at least two <br /> extraction pumps at any time. <br /> configuration is in en e o p water ater ¢om the edges theimpacte zone into the center, for <br /> additional remediation of impacted groundwater using the "pump-and-treat' method. <br /> i <br /> I <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.