Laserfiche WebLink
PUBLIC; HEALTH SEKVICES <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DIVISION <br /> Karen Furst, M.D. , M. P. H. , Health Officer <br /> r�<%FUtt��P <br /> 304 East Weber Avenue, Third Floor • Stockton, CA 95202 <br /> 209/468-3420 <br /> FLOYD BARNES <br /> 9744 FOUNTAIN VALLEY <br /> STOCKTON CA 95209 <br /> RE: Barnes Trucking Site Code: # 2506 <br /> 1817 Fresno Avenue <br /> Stockton CA 95206 <br /> WORKPLAN: Work Plan for Remedial Feasibility Testing <br /> DATED: August 17, 2001 <br /> PREPARED BY: Clearwater Group, Inc. <br /> APPROVED: x <br /> I A "ROVED: <br /> ADDE�NEEDED: Submit by. <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN 1H86 25299.37,subd(c) (3)]: <br /> 1. Installation of one 4-inch diameter dual-phase groundwater and soil vapor extraction test well. <br /> 2. Installation of one 2-inch diameter air sparge test point. <br /> 3. Feasibility tests including a step drawdown groundwater extraction (GWE) test, a soil vapor extraction (SVE) test, a <br /> combined SVE/GWE test and a SVE/air sparge test performed with GWE. <br /> 4. Preparation of a report of findings. <br /> 5. Preparation of a Corrective Action Plan. <br /> CONBt ENTS AND CONDITIONS: <br /> 1. All tests will be performed in accordance with the field test procedures included in the work plan. <br /> 2. All necessary permits will be obtained by Clearwater Group, Inc. prior to initiation of fieldwork <br /> 3. The report of findings must be submitted to PHS/EHD within sixty days following the completion of fieldwork <br /> 4. Fort}xeight hours notice to PHS/EHD is required prior to the initiation of fieldwork <br /> DATED O BY 2 t 01 ( '�N-tn r L. <br /> Lori Duncan, Senior RENS (2091468-0337 <br /> cc: Marty Hartzell, CVRWQCIB <br /> Brian Gwinn, Clearwater Group, Inc. <br /> A Division of San Joaquin County Health Care Services - <br />