My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1817
>
2900 - Site Mitigation Program
>
PR0540859
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 3:25:25 PM
Creation date
1/15/2020 2:31:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0540859
PE
2960
FACILITY_ID
FA0023361
FACILITY_NAME
PLAY N PARK (FORMER BARNES TRUCKING)
STREET_NUMBER
1817
Direction
S
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
1817 S FRESNO AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> .� Environmental Health Department DIRECTOR <br /> .O Donna Heran, REHS <br /> y 1868 East Hazelton Avenue <br /> Nt � PROGRAM COORDINATORS <br /> Stockton , California 95205 -6232 <br /> Robert McCiellon, REHS <br /> Jeff Carruesco, REHS, RDI <br /> • cq . ;a;P Website: www.sjgov. org/ehd Kasey Foley, REHS <br /> . <br /> � i r- o a Linda Turkatte, REHS <br /> Phone : (209) 468-3420 Rodney Estrada, REHS <br /> Fax: (209) 464-0138 Adrienne Ellsaesser, REHS <br /> September 4, 2013 <br /> Floyd Barnes <br /> 9477 Fountain Valley <br /> Stockton , CA 95209 <br /> Subject: Barnes Trucking <br /> 1817 Fresno Avenue <br /> Stockton, CA 95206 <br /> The San Joaquin County Environmental Health Department (EHD) reviewed an email (Email) <br /> from Stratus Environmental , Inc. (Stratus) , submitted on August 21 , 2013. In the Email , Stratus <br /> prepared an evaluation and summary of the results of a 5-Day Dual Phase Extraction (DPE) <br /> pilot test conducted at the subject site on April 29, through May 3, 2013. Stratus recommended <br /> a short-term 30-day DPE pilot test to further reduce the fuel contaminants remaining beneath <br /> the site. The EHD approves implementation of the 30Aay DPE pilot testing. However, in order <br /> to further evaluate and make recommendations for long term implementat(on of the remedial <br /> activity, the EHD requires weekly reporting during the pilot test to the EHD. The report should <br /> include the following : <br /> 1 ) Hydrocarbon mass removal rate; <br /> 2) Cumulative mass recovered; <br /> 3) Vapor concentrations or PID measurements; <br /> 4) Extraction flow rates and operational period in hours. <br /> If it becomes clear that the contaminant mass extraction rate will not improve significantly <br /> beyond that obtained during the 5-day pilot test, then the tests should be terminated . <br /> If you have any questions please call Lisa Medina at (209) 468-3455 . <br /> Regards, r� <br /> Lisa Medina , REHS Nuel C. Henderson, Jr. PG <br /> Senior Registered Environmental Health Specialist Engineering Geologist <br /> c: James Barton, CVRWQCB, 11020 Sun Center Drive #200, Rancho Cordova , CA 95670 <br /> Kasey Jones, Stratus, 3330 Cameron Park, Suite 550, Cameron Park, CA 95682 <br />
The URL can be used to link to this page
Your browser does not support the video tag.