My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1817
>
2900 - Site Mitigation Program
>
PR0540859
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 3:25:25 PM
Creation date
1/15/2020 2:31:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0540859
PE
2960
FACILITY_ID
FA0023361
FACILITY_NAME
PLAY N PARK (FORMER BARNES TRUCKING)
STREET_NUMBER
1817
Direction
S
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
1817 S FRESNO AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
------- -- ------ <br /> TABLE 4 <br /> REMEDIATION PILOT TEST <br /> SVE COMPONENT - EXTRACTION AND EMISSION RATES <br /> Barnes Trucking, 1817 South Fresno Avenue, Stockton, California <br /> Hour Sys. Influent Effluent Sys. Influent Cone. Effluent Conc. Extraction Rate from Emissions Rate [o Destruction Removal Cumulative GRO <br /> Date 2 Sample Meter Flowrate Flowratet (m m3 (mJms) Wells (lbs/day)4 Atmosphere lbs/da. ) Efficiency %) Removal lbs <br /> 'z Time Readings <br /> (stem) (acfrn) GRO Benzene MTBE GRO Benzene MTBE GRO Benzene MTBE GRO Benzene MTBE GRO Benzen MTBE Period Total <br /> 4/29/20132 1 10: 11 512.4 91 .7 171 .7 81 3.5 <0.2 <15 <0. 15 <0. 15 0-67 0.03 <0.0016 <0.23 <0.002 <0.0023 65.3% 92.0% NC --- - <br /> 4/29/2013 2 13:30 515.8 90.9 170,9 71 5.0 <0.2 -- - -- 0.62 0.03 <0A016 - -- -- - - -- 0.09 0.09 <br /> 4/292013 3 16:00 518.5 91 .3 171.3 380 10.0 <0.2 -- - - 1 .85 0.06 <0.0016 - -- -- - - - 0.21 0.30 <br /> 5/1/2013 4 7.40 557.9 86. 1 166. 1 200 8.4 <0.20 -- -- - 2.24 0.07 <0.0015 - -- -- - -- - 3.68 3.98 <br /> 5/3/2013 4 - 591 .6 -- - - - - - -- - 1 .55 -- -- - -- -- -- -- - 2. 17 6. 15 <br /> Legend / Ke <br /> seem = actual cubic feel per minute ORO = gasoline range organics <br /> safer = standard cubic feet per minute MTBE = methyl tertiary buryl ether <br /> Sys. = system Conc, = concentration <br /> mg/m' = milligrams per cubic meter <br /> lbs/day - pounds per day <br /> NC - Not Calculated due to influent and effluent concentrations were non-detect. i <br /> �Effluent Flow rate = System Influent flow rate + combustion air flow rate (80 cfin per marmitanrer's literature) <br /> '- GRO removed is calculated based on assuming 31 hours ofoperation occurred from start of test to First sample time. <br /> Hour mater readings based on most representative field data at tune of sampling for calculation purposes to approximate the mass removal. <br /> To calculate the extraction rate the ,svxteni influent concentrations are averaged between the sampling dates. <br /> Sample Calculations: <br /> Extraction Rate from 81 me x cu m ar x to x 91.7 cu it, x 1,440 rein = 1.23 lbs/day -� <br /> Wells (lbs/day) cu meter 35.3145 cu it 453593 mg min day <br /> Destruction Removal = (153.44 -Us) x100 = 99.83% <br /> Efficiency, % 153.44 <br /> Notes: <br /> 1 DPE test extracting from wall MW-10 only. <br /> 2 DPE test extracting from well MW-56 only. <br /> 3 DPE test extracting from wells TWA IW-7, IW-8, and MW-513. <br /> 4 DPE test, extracting from wells RV-7 and RV-8. Between 5/1/13 at 8, 10am to 5/2113 at 10 30a the system was extracting from well DV-8 only. System influent concentration and influent flow rate readings were not obtained prior to shutdown, due to the system <br /> automatically shut down fiom lack of propane mel before end of test. Therefore, the numerical values used (system influent flowrate and system influent concentration) to calculate the extraction rate ofGRO between 5/1/13 and end oftest were obtained from the 5/1/13 <br /> field visit. At this time the system remained extracting from wells PV-7 and RV-8. <br /> r.mtein ore int cablau Page l of l STRATUS <br />
The URL can be used to link to this page
Your browser does not support the video tag.