Laserfiche WebLink
plan before we issue the permit or before immediately requesting a verbal/email response from Jim . If my <br /> reasoning is incorrect, please let me know. <br />` Thanks, <br /> Gabe <br /> From : Scott fmailto :SBittinger@stratusinc. net] <br /> Sent: Tuesday, May 12, 2015 2:46 PM <br /> To: Gabriel Gonzalez [EH] <br /> Subject: FW: 1817 South Fresno Avenue, Stockton <br /> Gabriel : Here is Jim Barton's e-mail to me stating that it would take him 30+ days to issue / review the Notice of <br /> Intent. <br /> From : Barton, Jim@Waterboards [mailto:jim.bartonCcbwaterboards.ca .gov] <br /> j Sent: Monday, May 11, 2015 12 : 39 PM <br /> To: Scott <br /> Cc: Condon, Cori@Waterboards <br /> Subject: RE : 1817 South Fresno Avenue, Stockton <br />;I <br /> Hi Scott, <br /> Yes we received the Notice Of Intent (application) and check. Please send the MRP to me in Word format. <br />'I <br /> Typically we review the documents with the Work Plan, and if they are incomplete or require modifications, <br /> send a letter stating what is needed . Based on my current work load, the initial review could take in excess of 30 <br /> days. <br /> Once everything is satisfactory, we send up the Notice of Applicability, which starts the permit. <br /> Thanks. <br /> Jim Barton <br /> James L. L. Barton P . G. <br /> j Engineering Geologist <br /> Central Valley Regional Water Quality Control Board <br /> 11020 Sun Center Drive, #200 <br /> Rancho Cordova, CA 95670-6114 <br /> Office (916) 464-4615 <br /> ii Fax (916) 464-4645 <br /> j� From : Scott rmailto: SBittinger(@stratusinc. net] <br /> Sent: Monday, May 11, 2015 12:25 PM <br /> To: Barton, Jim@Waterboards <br /> Subject: RE: 1817 South Fresno Avenue, Stockton <br /> Jim : <br /> 2 <br />