My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002449
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1817
>
2900 - Site Mitigation Program
>
PR0540859
>
ARCHIVED REPORTS_XR0002449
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 3:41:53 PM
Creation date
1/15/2020 2:36:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002449
RECORD_ID
PR0540859
PE
2960
FACILITY_ID
FA0023361
FACILITY_NAME
PLAY N PARK (FORMER BARNES TRUCKING)
STREET_NUMBER
1817
Direction
S
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
1817 S FRESNO AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
highest groundwater concentration of TPHg (9,700 ug/L) was detected in MW-5B <br /> MTBE was not detected by EPA method 8260 in any of the groundwater saimples <br /> analyzed <br /> 2000-2003 <br /> Beginning in June 2000 groundwater in all monitoring well's has been sampled on a <br /> calendar quarterly basis These sampling events took place on June 6, 2000, August 28, <br /> 2000, November 14, 2000, February 13, 2001, May 30, 2001, August 22, 2001, October <br /> 11, 2001, February 14, 2002, May 10, 2002, September 30, 2002, December 4, 2002, <br /> March 5, 2003, and June 5, 2003 Reports documenting these activities have been <br /> l <br /> previously submitted to'the SJC/EHD by Clearwater <br /> 2002 <br /> A dual-phase test well and air sparge point was installed at the site in February 2002 • <br /> Remedial feasibility testing at the site was conducted during the week of March 10, 2002 <br /> _ - T The Wil -Ii - alla__h_o_n and Feasibility Testing Report=was_su6mitted___ May 9,_2002 <br /> From data collected dunng- these activities, Clearwater 'developed-and submitted a, <br /> Corrective Action Plan dated November 20, 2002 to the SJC/EHD <br /> 2004 <br /> During the third quarter of 2004, twelve remediation infection wells and an oxygen- <br /> infusion system ("iSOC") were installed on the site The iSOC system has increased DO <br /> in the -remediation wells from `,`baseline" levels of approximately 1 mg/L to <br /> concentrations on the order of 30 mg/L Clearwater conducted monitoring of the 1SOC <br /> system, and collection of DO, ORP, total and ferrous iron, pH, temperature, and specific <br /> conductivity measurements on a bi-weekly basis Clearwater performed system <br /> monitoring on a monthly basis and followed with ,a regular quarterly groundwater <br /> monitoring schedule <br />
The URL can be used to link to this page
Your browser does not support the video tag.