Laserfiche WebLink
• <br /> 2005 <br /> Clearwater conducted monitoring of the iSOC system., and collection of DO, ORP, total <br /> and ferrous iron, pH, temperature, and specific conductivity measurements on a monthly <br /> basis Clearwater monitored the groundwater monitoring well network on a regular <br /> quarterly monitoring schedule Additional samples were collected during the third quarter <br /> groundwater monitoring event for analysis of :n-direct geochemical parameters <br /> Microbial counts obtained during the third quarter indicated an increase in microbial <br /> growth had occurred since the installation and start up of the iSOC system <br />