Laserfiche WebLink
• <br /> CLEARWATER GROUP <br /> Grnundtivater Alntirtoring and Sampling�e1d Pr <br /> Groundwaterommitarin oeeclures <br /> Prior to beginning <br /> downhole a g' a deCOntammunation <br /> irisin quipinen#mini an area is established <br /> g in a first Alconoxg3 solution wash w Decont <br /> An no rinse nhotable water ( ash solation is nVed tion procedures consist <br /> Y 10"-dedicated downhole a and a second <br /> equipment is deconta rinse afpotable pumped through any Puxging p of scrubbing <br /> Prior to mmmInated water or de1omm1zed water if APs used <br /> gauging prior to use ),and <br /> pFessure toe ' Purgumg, and the latter is <br /> required <br /> equalize if local sal ►Iing a well, caps for all on <br /> yv <br /> measured to the nearest 0(l1 'r eater I5 <br /> Year, at under confined or se ells should be <br /> the request of the an electronic u ater sounder nn card opened to allow <br /> not available Project rrsana er, ixied eondttlons T atmospheric <br /> wilt be ' with which to establish g 'and during Clearwater`s first eeto <br /> Yo °S°e Is <br /> The static water level is <br /> deepl which <br /> between a reliable order of typical <br /> meas�ed once per <br /> observed will be collected usui each Well nmCreasin 1f histancal anal <br /> Ol leek in g a clear, o Floating g well contamination, ytical data are <br /> the bailer gPH pen_endcd g Separate-phase hydrocarbons the Fater sa <br /> cantainmg a measurable thiinackness aItelziativel product bailer, and the t (SPH) under grid tape <br /> collected from Y be measured iv,th an electronic hickness is ) where suspected or <br /> that well Wells contaf SPH before or loin aneasured to <br /> manager Field obse ming h droc g purging is not in <br /> probe An nearest <br /> ri'ations of we21 lite Y arbors sheen are sa additionally Purged Y omtormg well <br /> Data/purge Calculations form itY water level inpied, unless oand <br /> and floating product otherwise specified b o sample is <br /> Well Pur in thicknesses are noted on Y the project <br /> Each monitorin the Gauging <br /> (PH, tem g well to be sampled is purged using <br /> sample collected is representative <br /> of the 8 either a PVC bailer or <br /> etc are also Presentative of the purge Water are mmmonitored during submersible pip ph <br /> as a change measured Samlales are co aquifer If re g Purging Physical g of less than 0 25 required, g g activities to assess if the water <br /> pH units, less Pif par ters such as dissolved ax <br /> centigrade Considered repre <br /> (1 $degrees Fa lion I0/chars amm1eter stabili Ygen turbidity, <br /> from the bailer seg hrenhert)chan change In conductive rY Is achieved h', salinity <br /> Purging Initially, Parately from change m terriperaire Parameters are xn micro mhos Stability IS defied <br /> Y and at <br /> the rest of the , and less <br /> volumes have been re purging vol Purge Fater Para measured iii a discreet s than I 0 degree <br /> recharge moved ore intervals of one meters are measured at Ieast four t <br /> ge rate uimtil casin ainPIe decanted <br /> recorded on the py be samPled after fewer thanll completely dew tern pinging continues �s duan <br /> Wastes wge Data sheet three well vol atexs Wells that dewater or de three well casing <br /> stored on site n D O e is All meters used to mimes have been r nmmmstrate a <br /> water)is handled In one of three wasure paraineters are removed Well slow <br /> appropriate dis almProved 55. calibrated dailypurging information is <br /> trans he Ci facility 2) Pur gallon drums After bei 1)Purge and rm5eate Investigation derived <br /> ported to the Chea <br /> Purge and ru seate g chermvcall water rs sealed, labeled <br /> then transferred to S$ rwater cqu'Pnient `Fater is collected into Y prof <br /> then the , and <br /> water is collected in agallon drums yard in Point Richmond a 250- at" <br /> Is rerrmoved to an <br /> 250- pending disposal at an appropriate CA At the gallon portable holding <br /> applicable methal will be indicated iPnortable holden ppropriate dispoaldfactlthe lnvesti anon tank and <br /> g tank and g derived waste Is <br /> the field log sheets and transported <br /> to thea ty' or ) Purge and rinseate <br /> Groundwater Sa time correspondin PProgriate disposal facility <br /> g technical report The <br /> Groundwater sa Ie Collection <br /> exce 117PIes are collected Immediately <br /> els well recharge rate Y after <br /> If recharge is extremel 'samples are collected when purging, with <br /> volurlie for sa y slow, the well is allowed to has the followin <br /> mripling has accumulated has rec g exception I f the Purging <br /> collected umriulated recharge far at re harged to at least$p%n of its static water <br /> using Polyeth leve The well <br /> is s least two hours grate <br /> Compounds most se Y bailers, either dis amPled within 24 hours of ' if practicable level <br /> misitlel to volatilization Posable ar dedicated pur In ' or until sufficient <br /> supplied containers, labeled are collected first g g or Is re or <br /> Sala <br /> transport to astate-certified a do, Water sam the well San <br /> bean Ples are <br /> relevant Iocai or re nalytical <br /> laboratory a chain of costal Ples are placed in g analyzed for <br /> regional guidelines r' Analytical let form and placed on ice PproPmiate laboratory_ <br /> mics match or surpascooler for <br /> s standardn a sequ red by <br /> CLEAxWA7sa GROUP(GWS) <br /> l <br /> revised September 9, 200)5 <br />