My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002455
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1817
>
2900 - Site Mitigation Program
>
PR0540859
>
ARCHIVED REPORTS_XR0002455
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 4:00:43 PM
Creation date
1/15/2020 2:49:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002455
RECORD_ID
PR0540859
PE
2960
FACILITY_ID
FA0023361
FACILITY_NAME
PLAY N PARK (FORMER BARNES TRUCKING)
STREET_NUMBER
1817
Direction
S
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
1817 S FRESNO AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLEARWATER <br />' G R O U P <br /> £nveronmenloi Services <br /> Additional wells may be installed at a later time depending upon the performance of the initial <br /> Y P g P <br />' system configuration A permit application for the proposed injection wells is being submitted to <br /> SJC-EHS concurrently with this report <br /> 6.6 Deployment of iSOC Components <br /> The 1SOC infusion units (infusers) consist of a cylindrical perforated stainless steel casing, which <br /> houses the micro-porous hollow fiber material, which diffuses 02 to groundwater These <br /> Icomponents are connected to i/4-inch polyurethane tubing, which delivers a regulated 02 supply <br /> from the 02 gas cylinder and pressure regulator Tubing will be installed in narrow 12-inch-deep <br /> (approx ) saw-cut trenches A maximum of three iSOC units can be connected to a single 3-way <br /> control panel Based on manufacturer recommendations, the system will be operated at an <br /> oxygen flow rate of 15 cubic centimeters per minute (cc/min) and a pressure of 5 pounds per <br /> square inch (psi) above the maximum static water pressure Clearwater proposes to deploy up to <br /> six iSOC units and two 3-unit control panels during the initial phase Additional iSOC units may <br /> be added depending upon the performance of the initial system configuration If a positive effect <br /> 1s observed, additional iSOC units may be deployed, or the onginal six units may be relocated <br /> Figure 7 illustrates the proposed trenching layout, proposed iSOC injection well locations, and <br /> possible iSOC equipment shed locations <br /> 6.7 iSOC System Operations & Maintenance <br /> Routine O&M work will consist of field measurement of dissolved oxygen in selected <br /> injection/monitoring wells, documentation of oxygen consumption, and periodic nutrient <br /> Iinjections Clearwater will perform the O&M work at two--week intervals for the first month of <br /> operation, and on a monthly basis thereafter After the system stabilizes, monitoring will be <br />' performed on a quarterly basis and in conjunction with Quarterly Groundwater Monitoring <br /> Quarterly Monitoring Reports will provide groundwater monitoring results, and an update of <br /> system performance, adjustments, compliance, and other pertinent information Quarterly <br /> monitoring data may also provide basis for periodic relocation of 1SOC infusers <br /> ZB 178C RAP 22 May 18,2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.