Laserfiche WebLink
CLEARWATER <br />' )) G R O U P <br /> Envirunenenta[ Scrvscee <br /> 1 <br />' TABLE OF CONTENTS <br /> (CONTINUED) <br />' 7 0 GROUNDWATER MONITORING PROGRAM & <br /> zSOC OPERATION-MAINTENANCE 23 <br />' 7 1 Baseline Groundwater Monitoring 23 <br /> 7 2 Quarterly Groundwater Monitoring 23 <br /> 7 3 Monitoring Equipment Requirements 24 <br />' 7 4 Proposed Schedule 25 <br /> 80 CERTIFICATION 26 <br /> TABLES <br />' Table 1 Groundwater Elevations and Analytical Data <br /> Table 2 MNA Analytical Data <br /> Table 3 Well Construction Data <br /> FIGURES <br />' Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> Figure 3 Groundwater Elevation Map — 3/16103 <br />' Figure 4 Dissolved-Phase (Benzene) Contaminant Map — 3116103 <br /> Figure 5 Dissolved-Phase (TPHg) Contaminant Map— 3116103 <br />' Figures 6A, B, C, D Dissolved TPH & Benzene Decay Rates <br /> Figure 7 Proposed Infection Well & 1SOC System Layout <br /> APPENDICES <br />' Appendix A Clearwater Group Field Sampling Protocols <br /> Appendix B Groundwater Analytical Results (3/16103) <br /> Appendix C MNA Analytical Results (12/16/03) <br /> Appendix D iSOC System Details <br /> I <br /> ZB178C 111 May 21,2004 <br />