Laserfiche WebLink
I <br /> I <br /> Air Sparge <br />' Barnes Trucking Facility <br /> 1817 S Fresno St , Stockton, CA <br /> Desch tion Rate Unit Count Total <br />' Consulting oversight 2,500 Est 1 2,500 <br /> Well installation (4 Air Sparge Wells) 4,350 Est 1 4,350 4350 <br /> Trench , compound, sys constr 6,000 Est 1 6,000 <br />' Utility connection 1,000 Est 1 1,000 <br /> Blower 800 Mo 12 9,600 <br /> O&M costs 350 Mo 12 4,200 <br /> Energy costs 100 Mo 12 1,200 <br /> 28,$50 <br /> I <br /> Notes <br />' • assumes one year of operation <br /> • AS costs reduced by concurrent SVE system construction <br /> I� <br /> Additional Year of Operation <br />' O&M costs 350 Mo 12 4,200 <br /> Energy costs 100 Mo 12 1,200 <br /> 5,400 <br /> 1 � <br /> I <br /> I <br /> • <br /> I <br />' ZB178C Air Sparge Cost Estimate October 22,2002 <br />