Laserfiche WebLink
1 <br /> . Groundwater Extraction <br />' Barnes Trucking Facility <br /> 1718 S Fresno St , Stockton, CA <br />' Description Rate Unit Count Total <br /> Consulting oversight 4,000 Est 1 4,000 <br />' Well installation (8- 4 in dual phase wells) 9,360 Est 1 9,360 <br /> Trench, compound, sys constr 12,000 Est 1 12,000 <br /> Utility connection 1,500 Est 1 1,500 <br />' Pumps and installation 6,000 Est 8 48,000 <br /> 2,500 lbs aqua -phase GAC vessels 3,500 Ea 2 7,000 <br /> Sewer Connection and fees (22gpm) 2,000 Mo 12 24,000 <br /> O&M costs 1,000 Mo 12 12,000 <br /> Energy costs 300 Mo 12 3,600 <br />' Permitting 1,500 Est 1 1,500 <br /> 122,960 <br />' Notes <br /> • assumes one year of operation without GAC change-out <br /> Additional Year of O eration <br /> O&M costs 1,000 Mo 12 12,000 <br /> GAC recycling 5,000 Est 1 5,000 <br /> Energy costs 300 Mo 12 3,600 <br /> 20,600 <br /> ZB178C GWE Cost Estimate October 22 ,2002 <br />