My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002480
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1817
>
2900 - Site Mitigation Program
>
PR0540859
>
ARCHIVED REPORTS_XR0002480
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 4:14:00 PM
Creation date
1/15/2020 3:04:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002480
RECORD_ID
PR0540859
PE
2960
FACILITY_ID
FA0023361
FACILITY_NAME
PLAY N PARK (FORMER BARNES TRUCKING)
STREET_NUMBER
1817
Direction
S
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
1817 S FRESNO AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 <br />' Remedial Cost Comparison Cover Sheet <br /> Barnes Trucking Facility <br />' 1718 S Fresno St, Stockton,CA <br /> Option Soil Remed. GW Rented Total Install+ Yearly O&M <br /> Method Method lyr O&M After 1 yr <br /> Option 1 SVE with catox Air Sparge(AS)&GW Extract <br />' $96,550 $151,810 $248,360 80,000 <br /> Option 1A SVE with carbon GW Extract(GWE)&AS <br /> $68,650 $151,810 $220,460 45,400 <br /> Option 2 Excavate w/Treatment GWE with GAC <br /> $277,600 $122,960 $400,560 20,600 <br />' Option 3 Excavate w/Aeration GWE with GAC <br /> $136,600 $122,960 $259,560 20,600 <br />' Option 4 Excavate w/Treatment Enhanced Bioremediation(60C) <br /> $277,600 $80,575 $358,175 17,200 <br /> Option 5 Excavate w/Aeration Enhanced Bioremediation(iSOC) <br />' $136,600 $80,575 $217,175 17,200 <br /> Option 6 Natural Attenuation Enhanced Bioremediation(iSOC) <br />' Soil&Groundwater one cost $161,150 $161,150 34,400 <br /> t <br /> 1 <br /> 1 <br /> 1 <br /> • <br />' ZB178C Remediation Cost Comparison October 22,2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.