Laserfiche WebLink
1 <br /> 1 <br />' Remedial Cost Comparison Cover Sheet <br /> Barnes Trucking Facility <br />' 1718 S Fresno St, Stockton,CA <br /> Option Soil Remed. GW Rented Total Install+ Yearly O&M <br /> Method Method lyr O&M After 1 yr <br /> Option 1 SVE with catox Air Sparge(AS)&GW Extract <br />' $96,550 $151,810 $248,360 80,000 <br /> Option 1A SVE with carbon GW Extract(GWE)&AS <br /> $68,650 $151,810 $220,460 45,400 <br /> Option 2 Excavate w/Treatment GWE with GAC <br /> $277,600 $122,960 $400,560 20,600 <br />' Option 3 Excavate w/Aeration GWE with GAC <br /> $136,600 $122,960 $259,560 20,600 <br />' Option 4 Excavate w/Treatment Enhanced Bioremediation(60C) <br /> $277,600 $80,575 $358,175 17,200 <br /> Option 5 Excavate w/Aeration Enhanced Bioremediation(iSOC) <br />' $136,600 $80,575 $217,175 17,200 <br /> Option 6 Natural Attenuation Enhanced Bioremediation(iSOC) <br />' Soil&Groundwater one cost $161,150 $161,150 34,400 <br /> t <br /> 1 <br /> 1 <br /> 1 <br /> • <br />' ZB178C Remediation Cost Comparison October 22,2002 <br />