Laserfiche WebLink
' Soil Vapor Extraction with Catalytic <br /> Oxidizer and Air Sparge <br /> Barnes Trucking Facility <br />' 1718 S Fresno St , Stockton, CA <br />' Description Rate Unit Count Total <br /> Consulting oversight 3,000 Est 1 3,000 <br />' Well installation (15dual-phase wells) 17,550 Est 1 17,550 <br /> Trench , compound, sys constr 20,000 Est 1 20,000 <br /> Utility connection(assumes 3-phase available) 2,000 Est 1 2,000 <br /> O&M costs 1,000 Mo 12 12,000 <br /> Catox unit w/Sparge Compressor 3,000 Mo 12 36,000 <br /> Energy costs 500 Mo 12 6,000 <br /> 96,550 <br /> Notes <br /> • assumes one year of operation <br /> lipAdditional Year of Operation <br /> O&M costs 1,000 Mo 12 12,000 <br />' Catox unit 3,000 Mo 12 36,000 <br /> Energy costs 500 Mo 12 6,000 <br />' 54,000 II <br /> • <br /> I <br />' ZB 178C SVE/AS Cost Estimate October 22, 2002 <br />