Laserfiche WebLink
CLEAkWkTER <br /> G R o u P <br /> Environmental Services <br /> Certification <br /> This workplan was prepared under the supervision of a professional Registered Geologist in the state of <br /> California All statements, conclusions and recommendations are based solely upon published results <br /> from previous consultants, field observations by Clearwater Group and laboratory analysis performed <br /> by a California DOHS-certified laboratory related to the work performed by Clearwater Group <br /> Information and interpretation presented herein are for the sole use of the client and regulating agency <br /> The information and interpretation contained in this document should not be relied upon by a third <br /> party <br /> The service performed by Clearwater Group has been conducted in a manner consistent with the level of <br /> care and skill ordinarily exercised by members of our profession currently practicing under similar <br /> conditions in the area of the site No other warranty,expressed or implied, is made <br /> Clearwater Group VA. G 110 <br /> 2 N <br /> Prepared by ¢ m No 6508 Z <br /> OF c�L <br /> Adam R Newman Brian M Gw=, R G <br /> Project Scientist Senior Geologist <br /> Attachments <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan Showing Proposed Test Locations <br /> Figure 3 Groundwater Elevation Map-05/30/01 <br /> Figure 4 Sorbed-Phase Hydrocarbon Distribution Map <br /> Figure 5 Dissolved-Phase Contaminant Map -05/30/01 <br /> Figure b Proposed Dual-Phase Test Well Construction Diagram <br /> Figure 7 Proposed Sparge Test Point Construction Diagram <br /> Clearwater Group Field Protocols <br /> cc Mr Floyd Barnes, Barnes Trucking, 9744 Fountain Valley Drive,Stockton, CA 95209 <br /> Ms Elizabeth Thayer, CVRWQCB, 3443 Routier Road, Sacramento, CA 95827 <br /> ZB178C Workplan for remedial feasibility testing 12 August 2001 <br />