My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002483
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1817
>
2900 - Site Mitigation Program
>
PR0540859
>
ARCHIVED REPORTS_XR0002483
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 3:47:30 PM
Creation date
1/15/2020 3:07:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002483
RECORD_ID
PR0540859
PE
2960
FACILITY_ID
FA0023361
FACILITY_NAME
PLAY N PARK (FORMER BARNES TRUCKING)
STREET_NUMBER
1817
Direction
S
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
1817 S FRESNO AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLEARWATER <br /> G R 0 U P <br /> • ErtvisvrtmertlaP Services <br /> Groundwater Monitoring Schedule <br /> In order to gather important hydrogeologic and water quality data, Clearwater recommends the <br /> continuation of quarterly groundwater monitoring to run through the 2nd quarter of 2002 The need for <br /> continued adherence to the schedule will be re-evaluated after the 2nd quarter of 2002 <br /> Wells MWA through MW-8 will be monitored for the remaining quarters of 2001 Field activities will <br /> be performed in accordance with the Clearwater Field Protocols During each event, all wells will be <br /> sampled for concentrations of TPHg, BTEX, and MTBE by EPA Methods 8015M/8020/8260B and <br /> groundwater levels measured <br /> The results of morutonng efforts will be presented in brief reports which describe field and analytical <br /> methods, results, and project status The reports will be reviewed and signed by a California Registered <br /> Geologist at Clearwater In order to achieve some economy in labor, results of quarterly groundwater <br /> monitoring will be incorporated into larger reports as warranted <br /> Preparation of Feasibility Test Results Report <br /> Once the feasibility testing is complete and the resulting data is evaluated, Clearwater will prepare a <br /> report which will present the test results (i a flowrates, radius of influence, recovery rates) and <br /> provide a general efficiency evaluation of the technologies tested It is anticipated that these test <br /> results will be valuable in future preparation of a Corrective Action flan <br /> ZB178C Workplan for remedial feasibility testing 11 August 2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.