Laserfiche WebLink
1.0 PURPOSE <br /> This Site Safety Plan (SSP)establishes the basic safety guidelines and requirements for the above scope(s) of work <br /> at the above site (see Site Location Map-Figure 1) This SSP addresses the expected potential hazards that may be <br /> encountered during this project <br /> The provisions set-forth in this SSP will apply to Clearwater Group, Inc (Clearwater) employees and any <br /> subcontractors working for Clearwater at the ,fob site All personnel working for Clearwater, including <br /> subcontractors,at thejob site must read this SSP, and sign the attached Compliance Agreement(Appendix A)before <br /> entering the work area <br /> 2 0 FACILITY BACKGROUND <br /> 2.1 Site Layout and History (Site location is shown on Fig 1, site map on Fig 2) <br /> Previous Site Operations From To. <br /> From,. To <br /> Is site currently active9es No <br /> Work surface is sphalt Concrete Eel/DuD <br /> ASTs/USTs present9 Yes No Location <br /> Number of USTs removed Z- Location. 6-9 Date removedi,, q Z- <br /> 2.2 Soil Contamination <br /> Maximum benzene concentration in soil_Locatiorl S �4Afk P► 7— �5 I jCJ <br /> Maximum TPH concentration in soil,_._ LocattorL 5S_ `E-1'0 K T Y70-0 71'4) <br /> 2.3 Ground Water Wells and Contamination <br /> Number of monitoring wells at the site, <br /> Maximum dissolved benzene concentration to date d well <br /> Latest maximum dissolved benzene concentration Well, <br /> 2 4 Remediation <br /> Previous remedial system operation. From 194 To <br /> From To. <br /> Active remediation <br /> Number of SVE welly AS wells GWE wells <br /> Other (trenches, sumps, ) <br /> Remediation equipment on site, <br /> SSP 1 December 10, 1998 <br />