Laserfiche WebLink
CLEARWA" <br /> T <br /> C." R U 11 <br /> -;,� Environ rnen luf Scrvrces <br /> 4.3 Groundwater Field Testing &Monitoring <br /> j<= On September 7th and 8th, 2004, Clearwater performed field testing and monitoring of groundwater <br /> I <br /> ' chemistry, and field tests for DO, ORP, total Fe, and ferrous Fe were performed on water samples <br /> collected from the twelve injection wells (IW-1 through IW-12), and from the eight monitoring wells <br /> (MW-1 through MW-8). DO and ORP are measured with pre-cleaned down-well probes. Iron <br /> testing is performed by collecting water samples and use of a field test kit. The results of these field <br /> measurements and tests are presented in Tables 4 and 5. Clearwater's field data collection forms are <br /> `.1 provided in Appendix C. 1n general, initial DO concentrations were in the range of 0.1 mg/L to 2 <br /> =� mg/L, and ORP levels were in the range of 0 mV to +35 mV. Total iron concentrations ranged <br /> between 0 mg/L and 4 mg/L. Ferrous iron concentrations ranged between 0 mg/L and 1.4 mg/L. <br /> 4.4 iSOC System Installation <br /> On August 7a', and 8`h, 2004, Clearwater installed an underground tubing network, which connects <br /> the oxygen supply to each of the twelve injection wells. Tubing was installed in narrow 124nch- <br /> i a :' deep (approx.) saw-cut trenches. A single iSOC diffuser was deployed in each well, and was <br /> connected to its individual 02 supply line. Each 02 supply line is connected to one of the four 3-way <br /> ==� control panels located in the gas supply/control cage, which is baited-down to the concrete pavement. <br /> ;<;=a <br /> The system consists of twelve diffusers, four control panels, and five 02 supply tanks. Based on the <br /> != =E manufacturer's recommendations, the system is operated at an oxygen flow rate of 15 cubic <br /> centimeters per minute (cc/min) and pressure of approximately 5 pounds per square inch (psi) per <br /> 1=:-1 <br /> = ! diffuser. Figure 7 illustrates the trenching layout, injection well locations, and equipment cage <br /> k <br /> location. a �.� �r ,�, _ s��. l .�� �.,te <br /> 4.5 iSOC System Operations &Maintenance <br /> On September 24th, October 7th, and November 4th, 2004, Clearwater performed periodic system <br /> inspection and monitoring. Field monitoring for DO and ORP, and testing for total Fe, ferrous Fe, <br /> pH, and specific conductivity were performed on injection and monitoring wells. DO concentrations <br /> in the injection wells increased to within the range of approximately 20 mg/L to 35 mg/L (initial DO <br /> readings were within the range of 0.1 mg/L to 2 mg/L). ORP readings in the injection wells have <br /> generally decreased from readings in the range of 0 mV to +30 mV to the range of 0 mV to—30 mV. <br /> ZB178E iSOC System installation/Start-up 13 Nov.24,2004 <br />