Laserfiche WebLink
FAST-TEK Engineering Support Service. f <br /> .; ISOC SYSTEM FIELD MONITORING DATA <br /> CLIENT:/PM Jim Daley <br /> PROJECT NAME: Barnes Trucking Date: <br /> PROJECT NUMBER: ZB178E TECHNICIAN: Eric V Austin <br /> SYSTEM STATE DESCRIPTION UTILITIES <br /> InVentures ISOC system Oxygen Cylinder <br /> initial Install L IRoutine Maintenance <br /> '•_` ARRIVAL TIME DEPARTURE TIME <br /> Arrival System On?(Y/N) Time: f j Departure System On?(YIN) <br /> Ox en Cylinder ON ? es No Oxygen Cylinder ON? Yes I No <br /> 1^ yg si Tank Pressure l�`f si <br /> Tank Pressure �� <br /> Line Pressure psi Line Pressure si <br /> Adjustment of Gauges Adjustment of Gauges <br /> Well#1 (IW 1} Before After Well#1 (IW-5) Before After <br /> Inlet Pressure si Inlet Pressure si <br /> © cc/min Flow Rate cc I min <br /> Flow Rate E[�a, <br /> Well Pressuresi Well Pressure si <br /> Well 92 (IW 2) Well#2 (1W-6) <br /> �1 <br /> inlet Pressure si inlet Pressure si <br /> Flow Rate cc I min Flow Rate `z C cc/min <br /> Well Pressure si Well Pressure si <br /> Well#3 (IW-3) <br /> Well#3 (IW-7) <br /> Inlet Pressure t si Inlet Pressure �/ si <br /> Flow Rate 2 cc 1 min Flaw Rate �Q cc I min <br /> si Weil Pressure si <br /> Well Pressure i. <br /> Well#4(IW-4) Well#4 (IW-8) <br /> Inlet Pressu Psl Inlet Pressure psi <br /> Flow Rate (7 Z cc 1 min Flow Rate cc!min <br /> Well Pressure si Well Pressure psi <br /> WELL DA <br /> TA WELL DATA <br /> :c? Dissolved Oxygen Well # DTW Dissolved Oxygen Wel[ # DTW <br /> 1W-1 IW-7 <br /> IW-2 IW-8 <br /> =I IW-3 <br /> W-4 <br /> 1W-5 <br /> IW-6 <br /> s <br /> MAINTENANCE/DATA COLLECTION CHECKLIST(Check Items Completed) <br /> Item Check Description Schedule: <br /> Oxygen Cylinder Fj psi % full every visit <br /> ISOC Control Panel every visit <br /> Housekeeping every visit <br /> Other Maintenance Performed Sample check <br />