Laserfiche WebLink
FAST-TEK Engineering Support Service. <br /> # ISOC SYSTEM FIELD MONITORING DATA <br /> # CLIENT:!PM Jim Daley <br /> PROJECT NAME: Barnes Trucking Date: 1017104 <br /> PROJECT NUMBER: ZB178E TECHNICIAN: Eric V Austin <br /> SYSTEM STATE DESCRIPTION UTILITIES <br /> InVentures ISOC s stem Oxygen C tinder <br /> 1 Intial Install Routine Maintenance <br /> ARRIVAL TIME DEPARTURE TIME <br /> Arrival System On?(YIN) Time: Departure System On?(Y/N) <br /> Oxygen Cylinder ON? Yes 1 No Oxygen Cylinder ON? Yes 1 No <br /> Tank Pressure psi Tank Pressure si <br /> Line Pressure si Line Pressure psi <br /> Adjustment of Gauges <br /> Well#1 (IW-9) Before After Well#1 {) <br /> Inlet Pressure si Inlet Pressure si <br /> =:a Flow Rate Z cc I min Flow Rate cc 1 min <br /> Well Pressure psi Well Pressure si <br /> 1 Well#2(IW-10) Well#2 {) <br /> Inlet Pressure si Inlet Pressure si <br /> Flow Rate 7 J Zt� cc I min Flow Rate cc I min <br /> Well Pressure psi Well Pressure si <br /> Well#3(IW-11) Well#3 {} <br /> Inlet Pressure psi Inlet Pressure sl <br /> Flow Rate <br /> 20 cc/min Flow Rate cc 1 min <br /> Well Pressure si Well Pressure si <br /> •� <br /> Well#4(0-12) Well#4 {) <br /> Inlet Pressure sl Inlet Pressure psi <br /> Flow Rate fr 5ZXV cc/min Flow Rate cc/min <br /> Well Pressure psi Well Pressure si <br /> WELL DATA <br /> ELL DATA <br /> Dissolved Oxygen Well # DTW Dissolved Oxygen Well # DTW <br /> IW-9 <br /> ;.i IW-10 <br /> i-= <br /> IW_11 <br /> IW-12 <br /> MAINTENANCEIDATA COLLECTION CHECKLIST(Check Items Completed) <br /> Item Check Description Schedule: <br /> Oxygen Cylinder X PSI % fU every visit <br /> ISOC Control Panel X every visit <br /> Housekeeping X every visit <br /> } <br /> Sample check <br /> her Maintenance Performed <br /> Ot <br /> 'i <br /> l_ <br />