Laserfiche WebLink
FAST-TEK Engineering Support Service. <br /> ISOC SYSTEM FIELD MONITORING DATA <br /> CLIENT: <br /> PROJECT NAME: Barnes trucking Date: 11-4 1114104 <br /> PROJECT NUMBER: Z131 78F TECHNICIAN: Eric V.Austin <br /> SYSTEM STATE DESCRIPTION JUTILITIES <br /> InVentures ISOC system Oxygen Cylinder <br /> Initial install JX j Routine maintenance <br /> ARRIVAL TIME DEPARTURE TIME <br /> Arrival System On?(YIN) Time: Departure System On?(YIN) <br /> Oxygen Cylinder ON? Yes 1 No Oxygen Cylinder ON? <br /> Tank Pressure 2si Tank Pressure si <br /> Line Pressure psi Line Pressure si <br /> !y Adjustment of Gauges <br /> ISOC(IW-9) Before ISOC(MW-) After <br /> Inlet Pressure psi Inlet Pressure psi <br /> V^: Flow Rate cc I min Flaw Rate cc/min <br /> Well Pressure psi Well Pressure psi <br /> ISOC(Iw-10) ISOC(MW-) <br /> - � Inlet Pressure d si Iniet Pressure psi <br /> Flow Rate /S cc/min Flow Rate 2 cc/min <br /> Well Pressure psi Well Pressure psi <br /> ISOC(Iw-17) ISOC(MW-) <br /> - Inlet Pressure psi Inlet Pressure psi <br /> Flow Rate cc/min Flow Rate cc 1 min <br /> WeII Pressure psi Well Pressure psi <br /> _veYen'V, - ISOC(Iwa2) ISOC(MW-) <br /> Inlet Pressure psi Inlet Pressure psi <br /> Flow Rate cc i min Flow Rate cc/min <br /> Well Pressure psi Well Pressure psi <br /> h <br /> WELL DATA WELL DATA <br /> Well # M7VVIDIORP FE FE2+ PH TEMP. COND. <br /> jok MW-1 4- MW-5BMW-6 OZ17 <br /> SVE-W ELL 1. . D 015- D•2. 5, r>c� <br /> SPARGE-WELL <br /> �ml <br /> MAiNTENANCEIDATA COLLECTION CHECKLIST(Check items Completed) <br /> r <br /> Item Check Description Schedule: <br /> Oxygen.Cylinder X psi % full every visit <br /> ISOC Control Panel X every visit <br /> Housekeeping X every visit <br /> Other Maintenance Performed Sample check <br /> -i <br /> ;a <br /> __,l <br />