Laserfiche WebLink
--- - <br /> FAST-TEK Engineering Support Service. <br /> !- ISOC SYSTEM FIELD MONITORING DATA <br /> i � <br /> CLIENT_ <br /> PROJECT NAME: Barnes trucking Date: 11-41114104 <br /> PROJECT NUMBER: ZB178F TECHNICIAN: Eric V.Austin <br /> i <br /> SYSTEM STATE DESCRIPTION UTILITIES <br /> InVentures ISOC system Oxygen Cylinder <br /> ^i Initial install[ LA I <br /> Routine maintenance <br /> ARRIVAL TIME DEPARTURE TIME <br /> Arrival System On?(YIN) Time: Departure System On?(YIN) <br /> 1=- <br /> E- Oxygen Cylinder ON? Yes / No Oxygen Cylinder ON? <br /> Tank Pressure si Tank Pressure nsi <br /> Line Pressure si Line Pressure si <br /> Adjustment of Gauges <br /> ISOC(IW-5) Before ISOC(MW-) Atter <br /> Inlet Pressure 1-0 psi Inlet Pressure psi <br /> Flow Rate cc 1 mitt Flow Rate cc I min <br /> Well Pressure psi Well Pressure SI <br /> ISOC(IW-6) ISOC(MW-) <br /> ksi Inlet Pressure psi <br /> ,.i Inlet Pressure 2 Ca <br /> Flow Rate G cc I min Flow Rate cc 1 min <br /> Well Pressure psi Well Pressure psi <br /> ISOC(IW-7) ISOC(Mw-) <br /> Inlet Pressure psi Inlet Pressure psi <br /> Flow Rate 2 cc 1 min Flow Rate cc 1 min <br /> %= <br /> Well Pressure si Well Pressure psi <br /> Isoc(IW-8) ISOC(MW-) <br /> Inlet Pressure psi Inlet Pressure psi <br /> i Flow Rate Z cc 1 min Flow Rate cc f min <br /> Well Pressure si Well Pressure si <br /> WELL DATA WELL DATA <br /> Well # DTW DO ORP FE FE2f PFI TEMP. COND_ <br /> IW-8 0,f 7 "O <br /> IW-9 <br /> IW-10 f 4,0 -OCG <br /> IW-11 Inc <br /> IW-12 <br /> MAINTENANCE/DATA COLLECTION CHECKLIST(Check Items Completed) <br /> Item Check Description Schedule: <br /> Oxygen Cylinder X psi % full everyvisit <br /> i X revery <br /> 4visit <br /> ISOC Control Panel <br /> Housekeeping X <br /> Other Maintenance Performed Sample check <br />