My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
932
>
2900 - Site Mitigation Program
>
PR0527598
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 5:43:20 PM
Creation date
1/15/2020 4:45:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0527598
PE
2960
FACILITY_ID
FA0018700
FACILITY_NAME
RIPON FARM SERVICES
STREET_NUMBER
932
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102011
CURRENT_STATUS
01
SITE_LOCATION
932 FRONTAGE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Dave Isola • - 2 - 21 June 2012 <br /> create reducing conditions, which are favorable to microorganisms that convert nitrate into <br /> dinitrogen gas. This EHC addition is proposed to occur in a pilot test to evaluate the <br /> effectiveness and extent of the remediation zone. <br /> The pilot test is proposed to consist of two injection events. The first injection event will test the <br /> radius of influence of the injected substance, the results of which will be used to refine injection <br /> spacing in the pilot study. The second injection event will target the area around monitoring <br /> wells MW-103 and MW-104, where some of the highest concentrations of nitrogen are found at <br /> the facility. <br /> The proposed Treatability Study appears to qualify for consideration of permit coverage under <br /> General Order R5-2008-0149. Central Valley Water Board staff will review the Notice of Intent <br /> and provide Isola and Genesis Engineering with a letter stating what, if any, additional items are <br /> needed to complete the application. <br /> Central Valley Water Board staff conditionally concur with the Treatability Study, provided that <br /> Isola and Genesis Engineering obtain permit coverage under General Order R5-2008-0149 from <br /> the Central Valley Water Board Executive Officer. <br /> Thank you for providing the Treatability Work Plan and for including the Notice of Intent. We <br /> look forward to working with you to obtain permit coverage under the General Order for <br /> remediation at the former Ripon Farm Service site. If you have any questions, you may contact <br /> m by F <br /> t (916) 464-4680 or by email at aterrell@waterboards.ca.gov. <br /> AMY�E <br /> Private Sites Cleanup Unit <br /> cc: Mr. Kevin Werner, City of Ripon, Ripon <br /> Mr. Nuel Henderson, San Joaquin County Environmental Health Dept., Stockton <br /> Mr. Thomas de'Arth, Genesis Engineering and Redevelopment, Ripon <br /> Mr. Paul Lambert, Genesis Engineering and Redevelopment, Ripon <br /> Mr. John Cooper, Genesis Engineering and Redevelopment, Ripon (via email) <br />
The URL can be used to link to this page
Your browser does not support the video tag.