My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
932
>
2900 - Site Mitigation Program
>
PR0527598
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 5:46:48 PM
Creation date
1/15/2020 4:45:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0527598
PE
2960
FACILITY_ID
FA0018700
FACILITY_NAME
RIPON FARM SERVICES
STREET_NUMBER
932
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102011
CURRENT_STATUS
01
SITE_LOCATION
932 FRONTAGE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GES <br /> GENESIS ENGINEERING&REDEVELOPMENT <br /> Water Level Monitorinz <br /> Periodic water level measurements will be made in extraction wells (AT-1 S, EX-1, EX-2, <br /> EX-3 on Figure 6) to ensure that the water level in each well remains above the top of the <br /> screen to minimize bio-fouling as a result of introducing oxygen into water in the well <br /> casing. Periodic water level measurements will also be made in monitoring wells on-Site to <br /> determine the capture zone around each extraction well. At a minimum, water level <br /> measurement will be collected from: <br /> • MW-5, MW-101, RMW-5S, RMW-7S, RMW-7D, RMW-9, and RMW-11D <br /> (locations shown on Figure 7) <br /> Measurements from other existing monitoring wells or installation of new monitoring wells <br /> will be performed as necessary. In general, monitoring will occur more frequently at the start <br /> of the groundwater extraction system and less frequently over time. The measurement <br /> frequency for extraction and monitoring wells during each of the four operating periods are <br /> shown in the table below. <br /> Period Extraction Wells Monitoring Wells <br /> Pre-Startup Once Once <br /> As needed(high frequency <br /> Startup during start of pumping,at None <br /> least every 15 minutes) <br /> Equilibration 4 times per day Once per day <br /> Full System Operation 1 time per week 1 time per week <br /> Analytical Chemistry Monitoring <br /> Water samples will be periodically collected and analyzed for nitrate and TDS. Most water <br /> samples will be analyzed "in the field". For nitrate, field analysis will be made using an ion <br /> selective electrode in a laboratory set up on-Site. TDS will be calculated by converting <br /> specific conductance measurements made with a field water quality meter. A subset of <br /> samples will also be sent to an off-Site laboratory for nitrate analysis by EPA Method 300 <br /> and TDS analysis by EPA Method 160.1. Samples for chemical analysis will be collected <br /> from: <br /> R.F.Land Inc. 8 Of 11 <br /> Groundwater Extraction Work Plan <br /> October 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.