Laserfiche WebLink
GE <br /> GENESIS ENGINEERING&REDEVELOPMENT <br /> • Extraction wells AT-1 S, EX-1, EX-2, EX-3 (Figure 7) <br /> • Monitoring wells MW-5, MW-101, RMW-5S, RMW-7S, RMW-7D, RMW-9, and <br /> RMW-11D (Figure 7) <br /> • At the NPWS inlet and two additional locations downstream of the NPWS inlet <br /> The frequency of chemical analysis (field and fixed lab) for each operational period in the <br /> extraction wells, monitoring wells, and NPWS points are shown on the table below. <br /> Period Extraction Wells Monitoring We NPWS Points <br /> Pre-Startup Once Once Once <br /> 4 times per day(field) 4 times per day(field) <br /> Startup I time per day(lab) 1 time per month(lab) 1 time per day(lab) <br /> 2 times per day(field) 2 times per day(field) <br /> Equilibration I time per week(lab) 1 time per month(lab) 1 time per week(lab) <br /> Full System 1 time per week(field) 1 time per week(field) <br /> Operation 1 time per month(lab) 1 time per month(lab) 1 time per month(lab) <br /> Flow Rate Monitorine <br /> Flow meters will be installed at various locations in the system, and flow rate measurements <br /> will be recorded manually as well as continuously logged. Flow meters will be installed on <br /> the 2 inch discharge line from each extraction well (Figure 9), on the 4 inch pipe before it <br /> enters the blending tank, and between the blending tank and the connection to the NPWS. <br /> The frequency of measurements at each location is detailed in the table below. <br /> RF.Land Inc. 9 Of 11 <br /> Groundwater Extraction Work Plan <br /> October 2014 <br />