My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
932
>
2900 - Site Mitigation Program
>
PR0527598
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 5:46:48 PM
Creation date
1/15/2020 4:45:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0527598
PE
2960
FACILITY_ID
FA0018700
FACILITY_NAME
RIPON FARM SERVICES
STREET_NUMBER
932
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102011
CURRENT_STATUS
01
SITE_LOCATION
932 FRONTAGE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GE <br /> GENESIS ENGINEERING&REDEVELOPMENT <br /> • Extraction wells AT-1 S, EX-1, EX-2, EX-3 (Figure 7) <br /> • Monitoring wells MW-5, MW-101, RMW-5S, RMW-7S, RMW-7D, RMW-9, and <br /> RMW-11D (Figure 7) <br /> • At the NPWS inlet and two additional locations downstream of the NPWS inlet <br /> The frequency of chemical analysis (field and fixed lab) for each operational period in the <br /> extraction wells, monitoring wells, and NPWS points are shown on the table below. <br /> Period Extraction Wells Monitoring We NPWS Points <br /> Pre-Startup Once Once Once <br /> 4 times per day(field) 4 times per day(field) <br /> Startup I time per day(lab) 1 time per month(lab) 1 time per day(lab) <br /> 2 times per day(field) 2 times per day(field) <br /> Equilibration I time per week(lab) 1 time per month(lab) 1 time per week(lab) <br /> Full System 1 time per week(field) 1 time per week(field) <br /> Operation 1 time per month(lab) 1 time per month(lab) 1 time per month(lab) <br /> Flow Rate Monitorine <br /> Flow meters will be installed at various locations in the system, and flow rate measurements <br /> will be recorded manually as well as continuously logged. Flow meters will be installed on <br /> the 2 inch discharge line from each extraction well (Figure 9), on the 4 inch pipe before it <br /> enters the blending tank, and between the blending tank and the connection to the NPWS. <br /> The frequency of measurements at each location is detailed in the table below. <br /> RF.Land Inc. 9 Of 11 <br /> Groundwater Extraction Work Plan <br /> October 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.