My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GERTRUDE
>
300
>
3500 - Local Oversight Program
>
PR0545189
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 1:26:12 PM
Creation date
1/16/2020 12:08:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545189
PE
3528
FACILITY_ID
FA0005174
FACILITY_NAME
SUSD-FRANKLIN HIGH SCHOOL
STREET_NUMBER
300
Direction
N
STREET_NAME
GERTRUDE
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
14331006
CURRENT_STATUS
02
SITE_LOCATION
300 N GERTRUDE AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ASSOCIATES I N C . <br /> For protection of the seal at the land surface, a hole at least two feet in diameter will be excavated <br /> around the outside of each well casing to a depth of approximately two feet below ground <br /> surface. The sealing material used to seal the well will be allowed to spill over into the <br /> excavation. <br /> After the sealing material has set in well MW1, the excavation will be filled to within <br /> approximately 3 inches of surface grade with an aggregate material and the remaining 3 inches <br /> will be filled with asphalt patch or soil to restore the site's appearance. <br /> Based upon well construction details and assuming the filter pack for each well has an estimated <br /> porosity of 25% (Heath, R. C., 1983), an estimated volume of approximately 23 gallons of grout <br /> will be used to abandon well MW 1. Monitoring well construction data, soil boring logs, and <br /> gout volume calculations are attached. One permit application and associated fees (check no. 867) <br /> are attached. The application is for the single on-site monitoring well MWl. <br /> Report Preparation <br /> Upon completion of the well destruction activities, a summary report will be prepared for <br /> submittal to San Joaquin County Environmental Health Department (SJCEHD). The report will <br /> include a description of all field activities. <br /> All work described in this workplan will be performed under the direction of a California <br /> Registered Professional Engineer. All work will be performed in accordance with ATC's Site <br /> Safety Plan and Quality Control/Quality Assurance Plan for this site, on file at SJCEHD. <br /> Proiected Schedule <br /> ATC has tentatively scheduled field activities for February 9, 2004 because the school is not in <br /> session that day. Once approval of this workplan has been received, ATC will confirm the <br /> schedule for drilling activities. ATC will notify SJCEHD at least 48 hours prior to beginning any <br /> field activities. The summary report will be submitted to SJCEHD approximately two weeks after <br /> the completion of field activities. <br /> W:\17292.0001\wl-wellabandownent.doc 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.