Laserfiche WebLink
07 June 2012 <br /> AGE-NC Project No. 95-0184 <br /> Page 5 of 14 <br /> The proposed scope of work will consist of the following tasks: <br /> • Permitting and pre-field work preparations; <br /> • Drilling and soil sample collection; <br /> • Installation and development of remediation wells; <br /> • Installation of an updated remediation piping network to the wells; <br /> • Active soil vapor extraction and operation of in-situ air sparging; <br /> • Monitoring and sampling of active remediation (laboratory) and <br /> • Preparation of remediation report of findings. <br /> Each of these tasks are discussed below in detail. <br /> 3.1 . PERMITTING AND PRE-FIELD WORK ACTIVITIES <br /> Applicable site permits will be obtained from the EHD. A City of Stockton Encroachment <br /> permit and revocable access agreement will be secured and approved with the City. <br /> In addition, an update to the health and safety plan presently on-file will be prepared in <br /> accordance with Occupational Safety and Health Guidance Manual for Hazardous Waste <br /> Site Activities (National Institute for Occupational Safety and Health Administration, U.S. <br /> Coast Guard and U.S. Environmental Protection Agency, 1985). Prior to mobilization, the <br /> area of investigation will be clearly marked and a utility clearance obtained through <br /> Underground Service Alert. <br /> 3.2. INSTALLATION OF REMEDIATION WELLS <br /> AGE proposes installation of four additional shallow-screened SVE wells to be located near <br /> the southern UST release; the proposed shallow SVE well design is depicted in Figure 4. <br /> Additionally, AGE pro ses installation of two shallow-screened (45-50 feet bsg) and two <br /> deep screened (6}� 0 feet bsg) IAS wells in areas surrounding the former southern UST <br /> area and in the ar as of significant hydrocarbon impacts (soil impact with elevated <br /> benzene at depths o 65 feet bsg). The proposed shallow and deep IAS well designs are <br /> depicted in Figures and 6, respectively. Wells will be installed through the sidewalk of <br /> east Miner Avenue, urrounding the former souther UST area. <br /> Advanced CeoEnvironmental,Inc. <br />