My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011773
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRAND CANAL
>
2233
>
2900 - Site Mitigation Program
>
PR0504944
>
ARCHIVED REPORTS_XR0011773
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2020 9:43:29 AM
Creation date
1/17/2020 8:56:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011773
RECORD_ID
PR0504944
PE
2950
FACILITY_ID
FA0006428
FACILITY_NAME
BRIDGES SPECIALTY CENTER, THE
STREET_NUMBER
2233
STREET_NAME
GRAND CANAL
STREET_TYPE
BLVD
City
STOCKTON
Zip
95219
APN
11011006
CURRENT_STATUS
02
SITE_LOCATION
2233 GRAND CANAL BLVD
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> I <br /> I <br /> Suspension of loads when hoist is unattended should be avoided <br /> Hoisting loads directly over field personnel shall not be permitted. <br /> Restrict hoisting operations during unfavorable environmental conditions <br /> such as rain or high winds <br /> Maintain safe distance from hoisting equipment (e g , wire rope, hooks, <br /> pinch points) when slack is reduced. <br /> Responsibilities of driller, geologists, field crew, etc. during drilling <br /> operations shall be established beforehand. <br /> Begin auger borings slowly with the drive engine operating at low RPMs. <br /> Restrict contact with power coupling or auger during rotation <br /> Prevent placing hands or feet under auger during rotation <br /> Prevent placing hands or feet under auger sections during hoisting over <br /> hard surfaces. <br /> Avoid the removal of soil/cuttings with hands or feet <br /> Cleaning shall occur when drill ng is in neutral and the augers are not <br /> rotating <br /> 3.0 RESPONSIBILITIES AND ORGANIZATION <br /> The following section identifies the responsibilities of key positions for a <br /> subsurface investigation project <br /> Project Manager: Trevor Santochi <br /> Responsible for oversight of all aspects of the project. <br /> Health And Safety Officer (HSO): Trevor Santochi <br /> The Health and Safety Officer (HSO) has the responsibility for the site specific <br /> modification, implementation, and enforcement of the HASP. Specific <br /> responsibilities for the HSO include: <br /> • Evaluating health nsk potential for each site activity and establishing action <br /> levels to adjust protective requirements. <br /> • Implementing heat and cold stress monitoring and protective measures. <br /> CRC Fwnamcmd Rai:U&MODECK Im. PmJM/MUD-WI-4 <br /> JapPpy 29,19% 6 ZM O.md Cml WOL.Sumbm CA <br />
The URL can be used to link to this page
Your browser does not support the video tag.