My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011773
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRAND CANAL
>
2233
>
2900 - Site Mitigation Program
>
PR0504944
>
ARCHIVED REPORTS_XR0011773
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2020 9:43:29 AM
Creation date
1/17/2020 8:56:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011773
RECORD_ID
PR0504944
PE
2950
FACILITY_ID
FA0006428
FACILITY_NAME
BRIDGES SPECIALTY CENTER, THE
STREET_NUMBER
2233
STREET_NAME
GRAND CANAL
STREET_TYPE
BLVD
City
STOCKTON
Zip
95219
APN
11011006
CURRENT_STATUS
02
SITE_LOCATION
2233 GRAND CANAL BLVD
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Changes in grade shall be approached squarely to avoid shifting loads or <br /> unexpected weighting. <br /> A spotter (person at grade) to provide guidance when vertical and lateral <br /> clearance is questionable shall be utilized <br /> Use hand brakes and chock rig wheels when grades are steep <br /> Rig mast shall be lowered when traveling off-road <br /> All loads to ng shall be secured prior to off-road mobilization. <br /> Locate and treat overhead electrical lines as if they were energized <br /> Utilities agency shall be contacted to de-activate overhead service in areas <br /> that interfere with drilling operations Utilities shall be handled by utility <br /> personnel only <br /> Utilities agencies shall be contacted to survey, mark and flag locations of <br /> bund utility lines. <br /> Allow at least 20 feet clearance between ng mast and utility lines, and rate <br /> wind speed and direction. Prevent line contact with ng. <br /> Stabilize and level each work site prior to drill ng set-up, each work area <br /> shall be stabilized and leveled <br /> Maintain orderly housekeeping on and around the drill ng <br /> Store tools, materials and supplies to allow safe handling by drill crew <br /> members Proper storage on racks or sills will prevent spreading, rolling, <br /> or sliding <br /> Storage of transportation of tools, materials or supplies within or on the <br /> drill ng derrick shall be avoided. <br /> Store gasoline only in containers specifically designed or approved for such <br /> use. <br /> Wear eye protection when chipping, chiselling or breaking material that <br /> present risk of flying objects. <br /> Inspect wire, rope, hoisting hardware, swivels, hooks, bearings, sheaves, <br /> guides, rollers, clutches, brakes for the following. abrasions, breaks, wear, <br /> fatigue, corrosion, jamming and kinking <br /> CRC Fnvleueawl Ruk 1Nafrpmew.L% P.oJ.ot 0 3CO3001-4 <br /> !amy 29,1994 C 2233 cnea Cand Blvd.,&Ala�CA <br /> J <br />
The URL can be used to link to this page
Your browser does not support the video tag.