My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
500
>
2900 - Site Mitigation Program
>
PR0503286
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2020 4:46:54 PM
Creation date
1/17/2020 2:20:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0503286
PE
2953
FACILITY_ID
FA0005766
FACILITY_NAME
MOBIL OIL BULK PLANT
STREET_NUMBER
500
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25027008
CURRENT_STATUS
01
SITE_LOCATION
500 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I � <br /> ALTON <br /> - GEOSCIENCE <br />` THE RESULTS TEAM <br /> 4 I- <br /> January 14, 1997 <br /> San Joaquin County, Environmental Health Division County Site Code #1968 <br /> P.O. Box 2099 Alton Project No. 30-0136 <br /> 445 North San Joaquin Street <br /> Stockton, California 95201 <br /> i <br /> ATTN: MS. MARY MEAYS <br /> SITE: FORMER MOBIL BULK PLANT 04-343 <br /> 500 EAST GRANTLINE ROAD <br /> TRACY, CALIFORNIA <br /> RE: QUARTERLY PROGRESS REPORT <br /> FOURTH QUARTER 1996 <br /> Dear Ms, Meays: <br /> Please find enclosed the Quarterly Progress Report for the Fourth Quarter 1996 for the subject <br /> location, prepared for Mobil Oil Corporation by Alton..Geoscience. The contents of this report <br /> include: } <br /> Quarterly Progress Report Summary Sheet <br /> Exhibit 1: Sampling Schedule <br /> Exhibit 2: Groundwater Levels and Chemical Analysis Table <br /> Exhibit 3: Figures 1-3 (Vicinity Map, Groundwater Elevation Contour Map, Dissolved- <br /> phase Hydrocarbon Concentrations) <br /> Exhibit 4: Select TPH-D vs. Groundwater Elevation Graphs <br /> Exhibit 5: Well Purging and Groundwater Sampling Protocol <br /> Exhibit 6: Monitoring Well Sampling Forms <br /> Exhibit 7: Analytical Laboratory Data Sheets <br /> Exhibit 8: Waste Disposal Manifests <br /> If you have any questions regarding this report, please call Ms. Tara.Lynch, Mobil Engineer, <br /> at (703) 849-5316, or Ms. Ailsa Le May, Alton Gcoscience Geologist, at (510) 606-9150. <br /> s <br /> Sincerely, <br /> ALTON GEOSCIENCE 5 <br /> lsa_ <br /> Ailsa S. Le May <br /> _ <br /> Geologist <br /> 30-013610434314.QFM <br /> 30A Lindbergh Avenue <br /> Livermore,California 94550 <br /> (510)606-9150•FAX(510)606-9260 <br />
The URL can be used to link to this page
Your browser does not support the video tag.