My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2072
>
2300 - Underground Storage Tank Program
>
PR0231426
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 8:05:52 AM
Creation date
1/17/2020 2:36:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231426
PE
2361
FACILITY_ID
FA0004625
FACILITY_NAME
NATIONAL PETROLEUM MANTECA
STREET_NUMBER
2072
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
22202001
CURRENT_STATUS
01
SITE_LOCATION
2072 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB , January 2002 Page of <br /> 12 . SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested X * See comments <br /> Test Method Developed By : ❑ Spill Bucket Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> ❑ Other (Sped) <br /> Test Method Used : ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other (Specify) <br /> Test Equipment Used : Equipment Resolution : <br /> Spill Box # Spill Box # Spill Box # Spill Box # <br /> Bucket Diameter: <br /> Bucket Depth : <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time : <br /> Initial Reading (RI) : <br /> Test End Time : <br /> Final Reading (RF) : <br /> Test Duration: <br /> Change in Reading (RF-RI) : <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result : <br /> Comments — (include information on repairs made prior to testing, and recommended follow-ztp for•failed tests) <br /> * Spill/Overfill Containment Boxes tested annually with, Monitoring System Certification . <br />
The URL can be used to link to this page
Your browser does not support the video tag.