My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2072
>
2300 - Underground Storage Tank Program
>
PR0231426
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 8:05:52 AM
Creation date
1/17/2020 2:36:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231426
PE
2361
FACILITY_ID
FA0004625
FACILITY_NAME
NATIONAL PETROLEUM MANTECA
STREET_NUMBER
2072
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
22202001
CURRENT_STATUS
01
SITE_LOCATION
2072 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for NATIONAL PETROLEUM MANTECA as of December 16 , <br /> 2020 . <br /> Open violations from September 21 , 2020 inspection <br /> XThis violation was corrected ❑ This violation will be corrected by (date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : Provided missing test result . <br /> made sure with testing agency (Afforda Test) to submit test results to county with in 30 days in future . <br /> Violation #122 - Failure to implement corrections and submit written response within 30 days of receiving <br /> the report. <br /> OBSERVATION : An inspection was last done on 1 /29/2020 and an inspection report was issued identifying <br /> information to be submitted to bring this site into compliance . This information was required to be submitted by <br /> 2/28/2020 . This information was received late on 6/1 /2020 . <br /> REGULATION GUIDANCE : An operator that receives an inspection report shall have 30 days to implement the <br /> corrections specified in the inspection report and comply with permit conditions . The corrective action shall include <br /> all of the recommendations made in the report. The operator shall submit a written response that includes a <br /> statement documenting corrective actions taken or proposing corrective actions which will be taken . <br /> CORRECTIVE ACTION : Ensure that a written response documenting corrective actions taken or proposed is <br /> submitted and all corrections implemented within 30 days of receiving an inspection report. <br /> xThis violation was corrected ❑ This violation will be corrected by (date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : We will make sure to respond and comply in future . <br /> Violation #202 - Failure to retain a copy of the permit to operate at the facility. <br /> OBSERVATION : A copy of the UST operating permit was not found on site . <br /> REGULATION GUIDANCE : A copy of the UST operating permit and all attachments and conditions shall be <br /> retained at the facility . <br /> CORRECTIVE ACTION : Immediately obtain a copy of the permit and retain it on site . <br /> ❑ This violation was correctedThis violation will be corrected by (date) : 1 / 17/2021 <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : We didn 't received UST permit and were trying to <br /> contact EHD for the copy . We called and left messages as no one picks up phone to get the permit . <br /> We will keep trying and get a copy and keep it on site . <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.