My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2072
>
2300 - Underground Storage Tank Program
>
PR0231426
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 8:05:52 AM
Creation date
1/17/2020 2:36:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231426
PE
2361
FACILITY_ID
FA0004625
FACILITY_NAME
NATIONAL PETROLEUM MANTECA
STREET_NUMBER
2072
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
22202001
CURRENT_STATUS
01
SITE_LOCATION
2072 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB , January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By : X Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> ❑ Other (Specify) <br /> Test Method Used : X Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other (Spec) <br /> Test Equipment Used : Pressure Gauges in Psi/Nitrogen Equipment Resolution : 1 / 10- 15 Psi <br /> Piping Run #1 Piping Run #2 Piping Run #3 Piping Run #4 <br /> Piping Material : Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer : Ameron Ameron Ameron Ameron <br /> Piping Diameter: 2" 2" 2" 2" <br /> Length of Piping Run : Approx. 140 ' Approx. 16 ' Approx. 150 ' Approx. 25 ' <br /> Product Stored : Regular 87-Master Regular 87 - Siphon Super 110 Race <br /> Method and location of Test boot at STP Test boot at STP Test boot at Test boot at STP <br /> piping-run isolation : Piping Sump 91 Piping Sump #2 UDC #3 &4 Piping Sump #4 <br /> Wait time between applying 5 Minutes 5 Minutes 5 Minutes 5 Minutes <br /> pressure and starting test : <br /> Test Start Time : 10 : 00 10 : 05 10 : 10 10 : 15 <br /> Initial Reading (RI) : 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test End Time : 11 : 00 11 : 05 11 : 10 11 : 15 <br /> Final Reading (RF) : 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test Duration: 1 Hour 1 Hour 1 Hour 1 Hour <br /> Change in Reading (RF-RI) : 0 Psi 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi No Loss in Psi No Loss in Psi <br /> Criteria : <br /> Test Result: Pass Pass Pass Pass <br /> Comments — (include information on repairs made prior to testing, and recommended folloiv-zip for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.