My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2072
>
2300 - Underground Storage Tank Program
>
PR0231426
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 8:05:52 AM
Creation date
1/17/2020 2:36:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231426
PE
2361
FACILITY_ID
FA0004625
FACILITY_NAME
NATIONAL PETROLEUM MANTECA
STREET_NUMBER
2072
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
22202001
CURRENT_STATUS
01
SITE_LOCATION
2072 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB , January 2002 Page of <br /> 9 . UNDER-DISPENSER CONTAINMENT UDC) TESTING <br /> Test Method Developed By : ❑ UDC Manufacturer ❑ Industry Standard X Professional Engineer <br /> ❑ Other (Specify) <br /> Test Method Used : ❑ Pressure ❑ Vacuum X Hydrostatic <br /> ❑ Other (Specify) <br /> Test Equipment Used : Caldwell Level Change Indicator Equipment Resolution : . 002 <br /> UDC # 1 &2 JUDC # 3 & 4 UDC # 5& 6 UDC # 7& S <br /> UDC Manufacturer: Total Containment Total Containment Total Containment Total Containment <br /> UDC Material : Poly Plastic Poly Plastic Poly Plastic Poly Plastic <br /> UDC Depth : 23 " 23 " 23 " 23 " <br /> Height from UDC Bottom to Top 13 " 13 " 12" 12" <br /> of Highest Piping Penetration : <br /> Height from UDC Bottom to 5 " 5 " 5 " 4" <br /> Lowest Electrical Penetration : <br /> Condition of UDC prior to Dry Dry Dry Dry <br /> testing : <br /> Portion of UDC Tested ' Water Line 17 " Water Line 17" Water Line 16" Water Line 16" <br /> Does turbine shut down when <br /> UDC sensor detects liquid (both Yes Yes Yes Yes <br /> product and water)? * <br /> Turbine shutdown response time Not Alarmed Not Alarmed Not Alarmed Not Alarmed <br /> Is system programmed for fail- Yes Yes Yes Yes <br /> safe shutdown? ` <br /> Was fail-safe verified to be No No No No <br /> operational? * <br /> Wait time between applying 5 Minutes 5 Minutes 5 Minutes 5 Minutes <br /> water and starting test <br /> Test Start Time : 9 : 42 9 : 47 9 : 52 9 : 57 <br /> Initial Reading (RI) : . 001 . 001 . 001 . 001 <br /> Test End Time : 10 : 12 10 : 17 10 : 22 10 : 27 <br /> Final Reading (RF) : . 001 . 001 . 001 . 001 <br /> Test Duration : 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> Change in Reading (RF—RI): 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: . 005/30 Minutes . 005/30 Minutes . 005/30 Minutes . 005/30 Minutes <br /> Test Result : Pass Pass Pass Pass <br /> Was sensor removed for testing? Yes Yes Yes Yes <br /> Was sensor properly replaced and Yes Yes Yes Yes <br /> verified functional after testing? <br /> Comments — (inchide information on repairs made prior to testing, and recoinmended folloiv- zip for failed tests) <br /> ' If the entire depth of the UDC is not tested, specify how much was tested . If the answer to an of the questions indicated with an <br /> asterisk ( * ) is "NO" or "NA" , the entire UDC must be tested . (See SWRCB L& 160 ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.