Laserfiche WebLink
Mr. Michael J.Infurna, Jr. GEOMATRIX <br /> San Joaquin County Public Health Services <br /> 20 March 1997 tl <br /> Page 2 <br /> 2). The extraction wells will be capped and covered with Christy boxes constructed flush with adjacent <br /> ground surface. <br /> Well installation services will be provided by Spectrum Exploration, Inc. We understand that the San <br /> Joaquin County Environmental Health Division (County) has records of Spectrum's contractor <br /> information. Spectrum has previously sent an authorization letter to the County allowing Geomatrix to <br /> sign permit application forms. Well installation activities are anticipated to begin on 26 March 1997. <br /> The County will be notified at least 48 hours prior to initiating work or of any changes in the schedule. <br /> Enclosed with this application for permits to install wells are: <br /> • two completed application forms for installation of extraction wells <br /> • two checks.for$89.00 each <br /> • 15 November 1996 Remedial Action Work Plan prepared by Geomatrix <br /> • 27 November 1996 RWQCB approval letter to CPL for the Remedial Action Work Plan <br /> • Figure 1 - Proposed Locations of Extraction Wells <br /> • Figure 2 Preliminary Well Design <br /> II <br /> • City of Tracy Encroachment Permit No. 97-44 <br /> • 11 March 1997 Site Access and Remediation Agreement between CPL and Cardoza Properties, <br /> Inc. <br /> Please call if you need additional information. <br /> Sincerely yours, <br /> GEOMATRIX CONSULTANTS,INC. <br /> I <br /> Veen Chee Foong,P.E. Paula J. Hansen <br /> Project Engineer Senior Chemical Process Engineer <br /> Enclosures <br /> cc: Dan Lapporte,Chevron Pipe Line Company <br /> I <br /> OYROJE=9590958SX.DOC <br /> I <br /> I, <br />