My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GAWNE
>
16865
>
2900 - Site Mitigation Program
>
PR0505611
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2020 5:24:42 PM
Creation date
1/17/2020 4:36:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505611
PE
2951
FACILITY_ID
FA0006807
FACILITY_NAME
MORESCO PROPERTY
STREET_NUMBER
16865
STREET_NAME
GAWNE
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
18309009
CURRENT_STATUS
01
SITE_LOCATION
16865 GAWNE RD
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
gw4�*dTuhnies r a <br /> Page 4 <br /> McGranahan(Gawne Road) <br /> Project No.251.2 <br /> February 9, 1996 <br /> Recommended Soil Physical Characteristics to be Tested <br /> Boring sample moisture sieve bulk pH CEC TOC <br /> interval % mode density (meq/kg) (mg/kg) 5 <br /> (feet b s) (mesh) ( cc) <br /> SB-6 35 x x x x x x <br /> SB-6 50 x x ; z x x x <br /> SB-6 75 €:.... x........ <br /> x x F x x x x <br /> B-6 85 x x _ A x x x 1 <br /> 513-6 100 x x x x x x <br /> The above alternating shaded grouping of rows represent suggested layers of which <br /> the computer model might consider.'It i.s proposed that the samples be tested for the <br /> above parameters. <br /> 3.0 PROPOSED SCHEDULE OF WORK <br /> The proposed schedule for the additional site characterization work is as follows: <br /> Task Description Completion Data <br /> • Submit Site Characterization Work Plan Add#2 Feb. 12, 1996 <br /> • Receive approval for Work Plan Add #2 Feb. 23, 1996 <br /> • Submit cost pre-approval to USTCFP Feb. 29, 1996 <br /> • Receive USTCFP approval for cost of Work Plan Add #2 Mar. 15, 1996 <br /> • Drill boreholes and perform lab,testing Mar. 22, 1996 <br /> • Prepare a Site Characterization Report± r Apr. 5, 1996 <br /> z, <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.