Laserfiche WebLink
gw4�*dTuhnies r a <br /> Page 4 <br /> McGranahan(Gawne Road) <br /> Project No.251.2 <br /> February 9, 1996 <br /> Recommended Soil Physical Characteristics to be Tested <br /> Boring sample moisture sieve bulk pH CEC TOC <br /> interval % mode density (meq/kg) (mg/kg) 5 <br /> (feet b s) (mesh) ( cc) <br /> SB-6 35 x x x x x x <br /> SB-6 50 x x ; z x x x <br /> SB-6 75 €:.... x........ <br /> x x F x x x x <br /> B-6 85 x x _ A x x x 1 <br /> 513-6 100 x x x x x x <br /> The above alternating shaded grouping of rows represent suggested layers of which <br /> the computer model might consider.'It i.s proposed that the samples be tested for the <br /> above parameters. <br /> 3.0 PROPOSED SCHEDULE OF WORK <br /> The proposed schedule for the additional site characterization work is as follows: <br /> Task Description Completion Data <br /> • Submit Site Characterization Work Plan Add#2 Feb. 12, 1996 <br /> • Receive approval for Work Plan Add #2 Feb. 23, 1996 <br /> • Submit cost pre-approval to USTCFP Feb. 29, 1996 <br /> • Receive USTCFP approval for cost of Work Plan Add #2 Mar. 15, 1996 <br /> • Drill boreholes and perform lab,testing Mar. 22, 1996 <br /> • Prepare a Site Characterization Report± r Apr. 5, 1996 <br /> z, <br /> 1 <br />