Laserfiche WebLink
Geological Technics Inc. Page 6 <br /> Former Moresco Property , <br /> Additional Site Characterization;Work Plan . <br /> Project No.251.2 <br /> October 13, 1995 <br /> • and the identification of the licensed.analytical laboratory chosen for the project. <br /> It is expected that field work would commence no later than 60 days after work plan <br /> approval and upon issuance of the drilling permit. The information gathered during <br /> this phase of work will be presented in a report which will include a summary of the ' <br /> geology, the results of sample analyses, and professional conclusions and <br /> recommendations. Copies of the report will be forwarded to both the appropriate <br /> County and State regulatory agencies (SJCPHSEHD and CRWQCB). <br /> 4.0 SIGNATURE AND CERTIFICATION <br /> It is expected that this project be performed in accordance with accepted geologic <br /> and hydrologic standards of the State of California accepted and in effect at the time <br /> of this investigation: Geological Technics Inc. is not responsible -for undisclosed <br /> conditions. <br /> This work plan was prepared by: <br /> Timothy J. McDonald ; <br /> Geologist <br /> O��oFE5S1p^,�lc <br /> Raynold I. KablanAv II,Ph.D. h4 �.1.KABLANOW a �o <br /> California Registered Geologist#5234 U <br /> Registered Environmental Assessor#901 n. * No.5234 <br /> CA�1���\P <br /> II <br />