Laserfiche WebLink
Geological Technics In6.,, Page 5 <br /> Former Moresco Property <br /> Additional Site Characterization Work Plan <br /> Project No.251.2 <br /> October 13,1995 <br /> A chain of custody document, listing all samples collected, accompanies the samples <br /> from field to laboratory, thereby providing a means to track their movement and <br /> insure their integrity. <br /> All water purged from each monitoring well and not used as a sample, will be <br /> placed in a 55 gallon DOT approved container, properly labeled and stored on site <br /> until its proper disposition can be arranged. <br /> 2.5 Soil and Groundwater Laboratory Analyses <br /> Based on field screening observations at least four soil samples from each boring <br /> including one from the capillary fringe will be submitted to a licensed analytical <br /> laboratory and analyzed for benzene, toluene, ethylbenzene and xylene (BTEX by <br /> EPA method 8020), and gasoline range petroleum hydrocarbons analyses (TPH- <br /> GasoIine by EPA method 5030/8015m). The detection limits for these compounds <br /> are listed below. A Chain of Custody will be completed for all samples collected <br /> and tracked to ensure sample integrity. <br /> Detection Limits: BTEX TPH-Gas <br /> Water (µ /L) 0.3 50 <br /> Soil (µ /K ) 3.0 1,000 <br /> Water samples will be tested for BTEX using EPA method 602 and TPH-Gas using <br /> EPA method 5030/8015(m). The detection limits for these compounds in water are <br /> listed above in Table 1. We propose that two rounds of groundwater sampling <br /> occur, once shortly after well development and then again 30 days later. The results <br /> of both rounds will be reported in the report documenting the investigation. <br /> 3.0 SCHEDULE & REPORTING <br /> Once approved, it is intended that the this Work Plan be used as the bidding <br /> document for soliciting competitive bids for performing the work. The consultant <br /> upon being granted the contract will submit an addendum to this document which <br /> will include: <br /> • a site specific Health & Safety Plan, <br /> • an investigative methods Quality Assurance Program, <br /> • identification of the licensed professional geologist/engineer responsible for the <br /> project, <br /> • identification of the licensed C57 drilling contractor chosen for the project, <br />