My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
575
>
2900 - Site Mitigation Program
>
PR0542420
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 9:30:57 AM
Creation date
1/23/2020 9:25:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542420
PE
2960
FACILITY_ID
FA0024376
FACILITY_NAME
FORMER CHEVRON 98632
STREET_NUMBER
575
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
575 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br /> * Chemical analyses indicates that no unacceptable levels of <br /> hydrocarbon contamination remain <br /> Contamination can not be determined <br /> Soil samples will be collected from the bottom and/ or <br /> sidewalls of the excavation in areas of suspected <br /> contamination to verify the effectiveness of excavation <br /> activities . <br /> Soils removed during overexcavation will be screened and <br /> segregated based on field observations . If it is suspected <br /> that the soils contain detectable levels of oil and grease , <br /> these soils will be segregated away from the other <br /> stockpiles and a soil sample will be collected for analysis . <br /> The piles will be arranged as to take advantage of site <br /> space . Soils suspected to be oil contaminated will be placed <br /> on visqueen pending analytical results and subsequent <br /> disposal . Gasoline contaminated soils will be aerated on - <br /> site upon receiving aeration permits for reuse as on - site <br /> backfill material . <br /> Soils generated ( SP - la-b through SP - 6a -b ) from the gasoline <br /> UST and line removal will also be aerated for subsequent on - <br /> site disposal as backfill material . <br /> Soil Sampling and Analysis <br /> Soil samples will be collected in clean 6 - inch- long brass <br /> bis ( 2 inch—diameter);covered—at both ends—with—teflon <br /> tape and sealed with plastic end caps . The soil samples will <br /> be labeled , entered on a Chain- of - Custody form , put in a <br /> cooler with crushed ice and transported to a State - certified <br /> analytical laboratory . The samples collected from the pump <br /> island excavation will be analyzed for Total Petroleum <br /> Fydrocarbons ( TPH ) calculated as Gasoline according to EPA <br /> NIe -. hod 8015 ( Modified ) and Benzene , Toluene , Ethyl Benzene <br /> and Xylenes ( BTEX ) according to EPA Method 8020 . Soil <br />' Pcc iples collected from the waste oil tank , sump and hoist <br /> rr : ds will be analyzed for TPH - gas , BTEX , Total Oil and <br /> ( r : ase ( TOG ) according to EPA Method 5520F , Semi -Volatile <br /> cw anic Compounds according to EPA Method 8270 . <br /> P,z _lavated soils will be stockpiled on site and a soil <br /> stockpile sample will be collected for approximately every <br /> 25 cubic yards of excavated soil prior to covering with <br /> plastic . Four samples will then be composited in the <br /> laboratory for an analysis representative of approximately <br /> each 100 cubic yards of soil . Stockpile sampling will be for <br /> the purpose of characterizing soil for appropriate treatment <br /> e - na / or disposal requirements . <br />
The URL can be used to link to this page
Your browser does not support the video tag.