My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
15
>
3500 - Local Oversight Program
>
PR0545195
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 11:57:15 AM
Creation date
1/23/2020 11:44:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545195
PE
3528
FACILITY_ID
FA0002915
FACILITY_NAME
TRACY MARKET INC
STREET_NUMBER
15
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21435004
CURRENT_STATUS
02
SITE_LOCATION
15 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATC Associates Inc. <br /> Quality Assurance/Quality Control Plan <br /> Revised November 2002 <br /> 6.0 SAMPLING AND DRILLING EQUIPMENT DECONTAMINATION <br /> All equipment used for drilling and sampling will be decontaminated prior to use. All equipment <br /> used for collection of more than one sample, such as bailers and spoons, will be decontaminated <br /> between each use to prevent cross contamination between samples. Drilling equipment will be <br /> decontaminated prior to commencing drilling at each hole. Well construction materials will be <br /> cleaned as necessary, prior to installation. <br /> Equipment and well material decontamination will be conducted on an impermeable surface and <br /> all decontamination effluent will be contained. All surfaces of the equipment will be thoroughly <br /> decontaminated using a steam cleaner. The equipment will be placed on a drying rack for air <br /> i <br /> drying. The decontamination water will be stored in containers certified for hazardous materials <br /> storage and disposed of in an approved manner. <br /> Sample equipment to be used for pesticides and organic analysis will be washed in a <br /> nonphosphate detergent (Alconox or equivalent) and rinsed with tap water, followed by <br /> deionized water. If the equipment is for metals analysis, the initial rinse will be conducted with <br /> 0.1 N nitric acid followed by tap water and deionized water. <br /> i <br /> i <br /> 7.0 FIELD EQUIPMENT CALIBRATION AND MAINTENANCE <br /> The following measuring equipment may be used during the Remedial Investigation. Equipment <br /> is grouped by field activity. Calibration procedures and frequency are listed by piece. <br /> Soil Borings and Well Dimensions k <br /> Steel and coated cloth tape. Calibration: none. <br /> I <br /> f <br /> 4 <br /> w:\admin\shells\qaqc-02.doe k <br /> 5 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.