Laserfiche WebLink
I <br /> � � I <br /> Pestana Trust Page 2 <br /> Please submit a work plan to define the extent of soil and groundwater contamination, in addition to an <br /> interim soil remediation work plan to remove soil contamination by March 31, 1993. <br /> Groundwater sampling of the existing monitoring wells has been scheduled for January 29, 1993. The <br /> resultant quarterly report should be submitted by March 15, 1993. Additionally, note that during a recent <br /> site inspection, PHS/EHD observed ten 55 gallon drums in various locations on the site. PHS/EHD staff <br /> has been informed that the contents of these drums will be properly disposed. Please provide disposal i <br /> documention within the next quarterly report. Quarterly reporting is recognized as a minimum reporting <br /> requirement. <br /> r <br /> Reports, work plans and correspondence should be directed to both PHS/EHD and to the Central Valley <br /> Regional Water Quality Control Board (CVRWQCB). This will facilitate expeditious review of the site. <br /> '! <br /> Please be informed that PHS/EHD inspections of sampling events is an important aspect of local <br /> regulatory oversight. Please provide PHS/EHD 48 hours notice prior to any site activity, including <br /> sampling. <br /> If you have any questions, comments or wish to schedule a sampling inspection, please contact <br /> .Mary Meays, RENS, of my staff at (209) 468-0337. <br /> Jogi Khanna, M. M.P.H. <br /> Health Offi <br /> I ? <br /> Laurie A- Cotulla, RENS, Program Manager <br /> Environmental Health Division <br /> LACIMM275GL <br /> i� <br /> c: Elizabeth Thayer, CVRWQCB <br /> c: Gerald Sperry, Freeman Brown, Hartmann, and Sperry <br />