Laserfiche WebLink
Tom' � se r <br /> r� <br /> ma 9 <br /> 5150 <br /> PUN <br /> _- <br /> Rr51Vst co parm- fnvirnnrrrvntal 4alufiun+ <br /> T1rrau„G Applied SriMice, <br /> 1104 Gold(amp D1 ,"wfe 200 Fngirrrerhig 1 Cnnstrurli'm <br /> R,ini:hcr Caudou,C:1 951,71U <br /> Phoruo fl)[w ii .'-60110 <br /> 3-AX irflhi K521-6688 <br /> SITE SAFETY PLAN No. 38032-4S <br /> fat SUBSURFACE ENVIRONNIENTAL INVESTIGATION <br /> at the <br /> Unocal Service Station No. 6981 <br /> 4707 Pacific Street <br /> Stockton, California <br /> (March 19, 1991) <br /> INTRODUCTION <br /> This Site Safety Plan describes basic safety requirements for the subsurface environmental <br /> investigation. The provisions set forth in this Plan apply to the ernployees of Applied <br /> GeoSystems and its subcontractors working on this phase of the project. The subcontractors <br /> may elect to modify these provisions, but only to upgrade or increase the safety <br /> requirements, and only Nvith the concurrence of Applied GeoSystems, as designated and <br /> accepted in writing. <br /> This Site Safety Plan will address the expected potential hazards that may be encountered <br /> on the worksite for this project. Field activities are planned to begin upon approval of work <br /> plan by the San Joaquin County Environmental Health Division with the duration estimated <br /> to be approximately I month after the start date. if citange� in site or working conditions <br /> ” occur as activities progrc s, addenda to this plan will be provided by Applied GeoSystems. <br /> AUTHORITY FOR SITE SAFETY <br /> 'File Applied GeoSystems personnel responsible for project safety are the Project Manager <br /> and the Staff Geoiugist or Engineer. The Health and Safety Coordinator is responsible for <br /> the overall Applied GeoSystems Health and Safety Program and may choose to audit the <br /> site for compliance and take appropriate action to correct deficiencies. The Project <br /> Manager is responsible for implementing the provisions of this Plan, for providing a copy <br /> of this Plan to the Staff Geologist or Engineer, and for advising the Staff Geologist or <br /> Engineer on health and safety matters. The Project Nlanager and Staff Geologist or <br /> Engineer have the authority to audit site activities for compliance with the provisions of this <br /> Plan. They may suspend or modify work practices or dismiss subcontractoni whose conduct <br /> does not meet the requirements specified in this Flan. <br /> �x <br /> I <br />