My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012608
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4707
>
3500 - Local Oversight Program
>
PR0545229
>
ARCHIVED REPORTS_XR0012608
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 11:51:05 AM
Creation date
1/24/2020 11:21:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012608
RECORD_ID
PR0545229
PE
3526
FACILITY_ID
FA0003903
FACILITY_NAME
TOSCO CORPORATION #31258
STREET_NUMBER
4707
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10816004
CURRENT_STATUS
02
SITE_LOCATION
4707 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F 7 - "r <br /> a " <br /> F <br /> March 19, 1991 <br /> Unocal Station No. 698t, Stockton. California <br /> �a <br /> The Staff Geologist or Engineer is responsible for communicating the information contained <br /> in this Plan to the Applied GeoSystenis personnei assigned to the project and to the <br /> responsible representative of each subcontractor working for Applied GeoSystems on the <br /> project. <br /> 'Che Staff Geologist or Engineer will also act as the Site Sa,ety Officer. As such, the Staff <br /> CIP.ologist or Engineer is responsible for addressing the following items: <br /> o Implementing the Site Safety flan, Company policy, and procedures <br /> o Requiring and maintaining adequate safety supplies and equipment inventory <br /> onsite <br /> o Conducting daily safety meetings and advising workers regarding hazards <br /> o Site control, decontamination, and contamination-re due lion procedures <br /> a Reporting accidents or incidents <br /> The Staff Geologist or Engineer has the authority to suspend work any time lie or she finds <br /> that the provisions of the Plan are inadequate for worker safety. The Staff Geologist or <br /> Engineer will inform the Project Manager and the Health and Safety Coordinator promptly <br /> of deficiencies within the Plan or individuals or subcontractors whose conduct is not <br /> a� consistent with the requirements of this flan. <br /> MEDICAL SURVEILLANCE <br /> Applied GeoSyster-ts personnel and subcontractors engaged in project activities must <br /> participate in a medical surveillance program and mast be cleared by the examining <br /> physician(s) to wear respiratory protection devices and protective clothing for working with <br /> hazardous materials. The applicable requirements of Title S,Section 5216,of the California <br /> Administrative Code%will be observed. The applicable requirements under 29 CFR 1910.120 <br /> of the Federal Administrative Cocle will also be observed. <br /> SArETY AND ORIENTATION i1IEET]NG <br /> Field personnel from Applied GeoSystems and its subcontractors will attend a project- <br /> specific training meeting for safety issues and review the project tasks before beginning <br /> work. The meeting will be led by the Project Manager or Staff Geologist or Engineer. in <br /> ,_. <br /> 33032-45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.