Laserfiche WebLink
Former Tracy MGP Project Safety Plan(PSP) <br /> Exhibit 5.2-Mobilization/Kickoff Safety Meeting Checklist <br /> PARSONS <br /> ^, Mobilization/Kickoff Safety Meeting 9 <br /> Date: / Project/Location: Fky,<� l T s-azy <br /> 7 .t <br /> Parsons Representative: Subcontractor Representative: fzVL� 10 � <br /> The following project site safety, health and security requirements, procedures, and hazards have been identified and <br /> reviewed with the Subcontractor. <br /> SSP/Emergency Planning/Response Plan Demolition aC <br /> Competent/Qualified Person X Personal Protective Equipment <br /> Hazardous MaterialslWaste Cranes/Hoists/Annual Inspection Certificate <br /> Vehicle/Heavy Equipment Overhead Power Lines k <br /> Lockout/-ragout Confined Spaces(Permit/Non-Permit) B( <br /> Electrical DC Excavations/Trenching <br /> Fire Protection Site SecurityNisitor Control/Public Exposure <br /> Hot Work/Welding/Cutting Process Safety Management(PSM) b( <br /> Fall Protection/Guardrails/ VV Permits(Excavation/Scaffolding/Demolition/Traffic/ <br /> Scaffolding/Ladders t^ Confined Space/etc.) <br /> Additional Project Concerns: <br /> Other Attendees: <br /> Name Title Company <br /> (L realM(5' SU 5W$ <br /> ��aan� l�o� Thr r I lrr 1n1�.1c•>t�d <br /> 19 <br />