Laserfiche WebLink
� r <br /> Former Oakdale MGP Project Safety Plan(PSP) <br /> PARSONS <br /> Mobilization/Kickoff Safety Meeting <br /> Date:_-7 Project/Location: F6- -e f>6 ,e <br /> Parsons Representative_ G04�t "Subcontractor Representative: �s �wn� IGrnIu1 �0�NaVn <br /> The following project site safety, health and security requirements, procedures, and hazards have been identified and <br /> reviewed with the Subcontractor. <br /> SSP/Emergency Planning/Response Plan Demolition <br /> Competent/Qualified Person Personal Protective Equipment <br /> Hazardous Materials/Waste Cranes/Hoists/Annual Inspection Certificate <br /> Vehicle/Heavy Equipment V� Overhead Power Lines <br /> Lockout/Tagout Confined Spaces(Permit/Non-Permit) <br /> Electrical V/ Excavations/Trenching <br /> Fire Protection Site Security/Visitor Control/Public Exposure <br /> Hot Work/Welding/Cutting Process Safety Management(PSM) Z <br /> Fall Protection/Guardrails/ Permits(Excavation/ScaffoldinglDemelition Traffic/ <br /> Scaffolding/Ladders Confined Space/etc.) <br /> Additional Project Concerns: <br /> Other Attendees: <br /> Name Title Company <br /> So, S r, 3(,�/rsf `�iyzy's � <br /> C Ga ryas- U�X'- L3eedW-4 <br /> cJPrew YV V <br /> �„�� AI-21 <br />