Laserfiche WebLink
Exhibit 5-3—MobifizationlKickoff Safety Meeting Checklist <br /> PARSONS <br /> Mobilization/Kickoff Safety Meeting <br /> 4 F7 <br /> Date: Project/Location: <br /> v'g <br /> Parsons Representative: (i Subcontractor Representative: <br /> The following project site safety, health and security requirements, procedures, and hazards have been identified and <br /> reviewed with the Subcontractor. <br /> A� <br /> SSP/Emergency Planning/Response Plan Demolition <br /> Competent/Qualified Person Personal Protective Equipment <br /> Hazardous Materials/Waste E Cranes/Hoists/Annual Inspection Certificate <br /> Vehicle/Heavy Equipment Overhead Power Lines <br /> Lockout/Tagout Confined Spaces(Permit/Non-Permit) <br /> Electrical Excavations/Trenching <br /> Fire Protection Site Security/Visitor Control/Public Exposure <br /> JJ <br /> Hot Work/Welding/Cutting Process Safety Management(PSM) <br /> Fall Protection/Guardrails/ Permits(Excavation/Scaffolding/Demolition/Traffic/ <br /> Scaffold ing/Ladders Confined Space/etc.) <br /> Additional Project Concerns: <br /> Other Attendees: <br /> Name Title Company <br />